Laserfiche WebLink
WJ <br />GEM YTUDDR <br />SUBMITTED TO TO <br />City Of Elk River <br />TELEPHONE <br />DATE <br />8113125 <br />_ADDRESS <br />13065 Orono Parkway <br />PROJECT NAME <br />Dodge Ave Pond Dredging <br />CITY, STATE, ZIP <br />PROJECT LOCATION <br />Elk River Mn 55330 <br />Dodge Ave <br />ENGINEER <br />CONTACT PERSON <br />TELEPHONE <br />City Of Elk River Engingeering <br />Ryan Sandhofener P.E. <br />763-635-1053 <br />WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR <br />Quantity <br />Cost <br />Extended Price <br />DESCRIPTION <br />Mobilization <br />1 <br />$1,200 <br />$1,200 <br />Lump Sum Labor <br />1 <br />$32,1941 <br />$32,194 <br />Scope of Work: <br />Dewatering <br />- Fully dewater the pond using approved pumping methods to allow access to the entire basin. <br />- Implement temporary erosion and sediment control measures per project specifications to protect <br />downstream waterways. <br />Sediment Removal <br />- Mechanically remove approximately 2 feet of accumulated sediment across the pond bottom, down <br />to the virgin sand layer as indicated in the RFQ. <br />- Confnn sediment depth and removal limits with owner/engineer prior to full excavation. <br />Material Handling & Disposal <br />- Load, haul, and export dredged sediment to a local landfill facility. <br />- Dispose of material in compliance with all applicable regulations and requirements outlined in the <br />RFQ. <br />- Provide landfill receipts and documentation as proof of proper disposal. <br />Site Stabilization <br />- Grade and shape disturbed areas to original contours or as specified in the RFQ. <br />- Install stormwater basin seed mix over all disturbed soil areas. <br />- Cover seeded areas with erosion control blanket to ensure soil stabilization. <br />Monitoring & Maintenance <br />- Monitor seeded areas for germination and growth. <br />- Maintain and repair erosion control measures as needed until satisfactory vegetation establishment <br />has been achieved and accepted by the owner/engineer. <br />*Unit Price for Removal & Disposal of Sediment Material is 33.17 per unit* <br />Material: <br />Ex ort Sediment <br />1 <br />$33,821 <br />$33,821 <br />Truckin <br />1 <br />$25,424 <br />$25,424 <br />Erosion Control Blanket <br />1 <br />$5,078 <br />$5,078 <br />Seed Restoration <br />1 <br />$2,500 <br />$2,500 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />1 <br />$0 <br />$0 <br />M PROPOSE HEREBY TO FURNISH MATERIAL AND LABOR --COMPLETE IN ACCORDANCE VNTH ABOVE SPECIFICATIONS FOR THE SUM OF: <br />dollars S $100,217 <br />CALMENT TO BE MADE AS FOLLOWS <br />AN EXTPACIAI.E IVEIANDAEIVETLE EETI-E ALLA.IEE.ENTE NOTE THIS PROPOSAL.- BE WITHDRAWN BY US <br />C'Smmar <br />ACCEPTANCE OF PROPOSAL -THE ABOVE PRICES, SPECIFICATIONS <br />SIGNATUREAND <br />CONDITIONSARE SATISFAC YOU ARE <br />AUTHOARED TO DO THE WORD AS SPECIFIED VACIAEN <br />OUTLINED ABOVE <br />OF ACCEPTANCE. <br />TITLE <br />Page 95 of 104 <br />