Laserfiche WebLink
<br />Oakwater Ridge EAW 4 <br />Findings of Fact and Conclusions, Response to Comments, and Record of Decision <br />located at 165th Avenue and Gateway Road. The record plans for the extension of gravity sewer <br />to 165th Avenue (dated June 13th, 2023) are included as Appendix C. These plans were <br />developed/evaluated as part of the Natures Edge Business Center 3rd Addition Improvements. <br /> <br />The flow rates were all based on “the industry standard” per the City of Elk River’s Engineering <br />Project Manager. Per the City’s Comprehensive Plan (adopted October 18th, 2021), the upgraded <br />treatment capacity was based on estimates of 2035 daily flow and projected areas of <br />development. Section 4000 of the City’s Engineering Design Standards states the following: <br /> Sanitary sewer extensions shall consider each residence to include 3.3 people on the <br />average. <br /> Sewage flow design rates shall be 110 gallons per person per day. <br /> <br />Comment 3: Wastewater - A figure should be provided that shows the location of the major sewer system <br />features in the Project area that are described in the EAW. <br /> <br />Response: See exhibit 1 on the following page. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />