Laserfiche WebLink
Page 9 <br /> <br /> <br />Table 6. Green Infrastructure Pre- & Post- Development <br />Green Infrastructure Before <br />(acres) <br />After <br />(acres) <br />Constructed infiltration systems (Infiltration basins)1 0.00 5.03 <br />Constructed tree trenches and tree boxes 0.00 0.00 <br />Constructed wetlands 0.00 0.00 <br />Constructed green roofs 0.00 0.00 <br />Constructed permeable pavements 0.00 0.00 <br />Other (describe) 0.00 0.00 <br />TOTAL 0.00 5.03 <br />1 The post-development infiltration systems are based on a concept plan and are subject to change. <br /> <br />Table 7. Tree Removal and Planting <br />Trees1 Pre-Development <br />Area2 <br />Post-Development <br />Area3 <br />Percent tree canopy removed, or number of <br />mature trees removed during development 60.89 ac. 26.96 <br />1 A tree survey has not been completed for the project area. <br />2 Based on aerial estimates, approximately 60.89 acres of trees are in the project area. <br />3 Based on aerial estimates (and the concept plan), approximately 26.96 acres of trees are roughly estimated to be unaffected <br />by the development. The overall number/area of tree cover post development will likely exceed this amount. Trees will be <br />planted/preserved throughout the greenway corridor. The development will abide by Chapter 30 Section 30-936 of the Elk <br />River City Code. Two trees are required in all single-family uses. (536 x 2 = 1,072 trees (note: some of the lots already have <br />two trees)). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />