Laserfiche WebLink
<br />14 <br /> <br />6.0 PROCEDURES <br /> <br />6.1 Soil Classification <br /> <br />The drill crew chief visually and manually classified the soils encountered in the borings in <br />general accordance with ASTM D 2488, “Description and Identification of Soils (Visual- <br />Manual Procedure).” Soil terminology notes are included in the Appendix. The samples were <br />returned to our laboratory for review of the field classification by a soils engineer. Samples <br />will be retained for a period of 30 days. <br /> <br />6.2 Groundwater Observations <br /> <br />Immediately after taking the final samples in the bottom of the boring, the hole was checked <br />for the presence of groundwater. Immediately after removing the augers from the borehole <br />the hole was once again checked and the depth to water and cave-in depths were noted. <br /> <br /> <br />7.0 GENERAL <br /> <br />7.1 Subsurface Variations <br /> <br />The analyses and recommendations presented in this report are based on data obtained from <br />a limited number of soil borings. Variations can occur away from the boring, the nature of <br />which may not become apparent until additional exploration work is completed, or <br />construction is conducted. A reevaluation of the recommendations in this report should be <br />made after performing on-site observations during construction to note the characteristics of <br />any variations. The variations may result in additional foundation costs and it is suggested <br />that a contingency be provided for this purpose. <br /> <br />It is recommended that we be retained to perform the observation and testing program during <br />construction to evaluate whether the design is as expected, if any design changes have affected <br />the validity of our recommendations, and if our recommendations have been correctly <br />interpreted and implemented in the designs, specifications and construction methods. This <br />will allow correlation of the soil conditions encountered during construction to the soil borings <br />and will provide continuity of professional responsibility. <br /> <br />7.2 Review of Design <br /> <br />This report is based on the design of the proposed structures as related to us for preparation <br />of this report. It is recommended that we be retained to review the geotechnical aspects of the <br />design and specifications. With the review, we will evaluate whether any changes have <br />affected the validity of the recommendations and whether our recommendations have been <br />correctly interpreted and implemented in the design and specifications. <br /> <br />7.3 Groundwater Fluctuations <br /> <br />We made water level measurements in the borings at the times and under the conditions stated <br />on the boring log. The data was interpreted in the text of this report. The period of observation <br />was relatively short and fluctuations in the groundwater level may occur due to rainfall,