My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 EAW Attachment
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
08-04-2025
>
4.4 EAW Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 2:29:06 PM
Creation date
8/19/2025 2:19:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1786
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />14 <br /> <br />6.0 PROCEDURES <br /> <br />6.1 Soil Classification <br /> <br />The drill crew chief visually and manually classified the soils encountered in the borings in <br />general accordance with ASTM D 2488, “Description and Identification of Soils (Visual- <br />Manual Procedure).” Soil terminology notes are included in the Appendix. The samples were <br />returned to our laboratory for review of the field classification by a soils engineer. Samples <br />will be retained for a period of 30 days. <br /> <br />6.2 Groundwater Observations <br /> <br />Immediately after taking the final samples in the bottom of the boring, the hole was checked <br />for the presence of groundwater. Immediately after removing the augers from the borehole <br />the hole was once again checked and the depth to water and cave-in depths were noted. <br /> <br /> <br />7.0 GENERAL <br /> <br />7.1 Subsurface Variations <br /> <br />The analyses and recommendations presented in this report are based on data obtained from <br />a limited number of soil borings. Variations can occur away from the boring, the nature of <br />which may not become apparent until additional exploration work is completed, or <br />construction is conducted. A reevaluation of the recommendations in this report should be <br />made after performing on-site observations during construction to note the characteristics of <br />any variations. The variations may result in additional foundation costs and it is suggested <br />that a contingency be provided for this purpose. <br /> <br />It is recommended that we be retained to perform the observation and testing program during <br />construction to evaluate whether the design is as expected, if any design changes have affected <br />the validity of our recommendations, and if our recommendations have been correctly <br />interpreted and implemented in the designs, specifications and construction methods. This <br />will allow correlation of the soil conditions encountered during construction to the soil borings <br />and will provide continuity of professional responsibility. <br /> <br />7.2 Review of Design <br /> <br />This report is based on the design of the proposed structures as related to us for preparation <br />of this report. It is recommended that we be retained to review the geotechnical aspects of the <br />design and specifications. With the review, we will evaluate whether any changes have <br />affected the validity of the recommendations and whether our recommendations have been <br />correctly interpreted and implemented in the design and specifications. <br /> <br />7.3 Groundwater Fluctuations <br /> <br />We made water level measurements in the borings at the times and under the conditions stated <br />on the boring log. The data was interpreted in the text of this report. The period of observation <br />was relatively short and fluctuations in the groundwater level may occur due to rainfall,
The URL can be used to link to this page
Your browser does not support the video tag.