My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Packet 08-04-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
08-04-2025
>
City Council Packet 08-04-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 5:01:14 PM
Creation date
8/13/2025 4:58:21 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes <br />July 21, 2025 <br />Page 4 of 9 <br />7. Staff approval of all site and civil plans. <br />8. All motor vehicle repairs, bodywork, or detailing shall only occur inside the building. <br />9. Exterior doors shall be closed while any motor vehicle repair, body work, or <br />detailing occurs. <br />10. The storage of damaged or inoperable vehicles shall only be allowed inside the <br />fenced storage area. <br />Motion carried 5-0. <br />7.3 Preliminary Plat: Oakwater Ridge, Capstone Homes - 16330 US Highway 10 <br />The staff report was presented. <br />Mayor Dietz opened the public hearing. <br />Matt Barker, Capstone Homes, thanked the Council and staff. <br />Mayor Dietz closed the public hearing. <br />Mayor Dietz asked about the timing of improvements to the Highway 10 intersection. Mr. Carlton <br />stated that information would be determined by how many homes are proposed on the final plat and <br />MnDOT's recommendation. The City will work with Capstone to prepare plans through MnDOT then <br />hire a contractor. <br />Moved by Councilmember Beyer and seconded by Councilmember Wagner to approve <br />the preliminary plat for Oalcwater Ridge, subject to the following conditions: <br />I . The EAW for Oakwater Ridge must produce a negative finding for an EIS, and all <br />comments from the public comment period must be addressed to the satisfaction <br />of the representative agency. <br />2. Billboards along Highway 10 must be removed as the subdivision is developed and in <br />accordance with City Council resolution 25-31. <br />3. Staff approval of all site, utility, grading, and landscape plans. <br />4. All wet stormwater basins require a 25-foot easement in accordance with setback <br />and buffer requirements outlined in Sec. 30-1852. The buffer must be marked with <br />approved signs. <br />S. Setback lines shown on the preliminary plat must reflect the 45-foot setback <br />required for all wet ponds. <br />6. Trails and other features within the floodplain must comply with the floodplain <br />ordinance standards. <br />7. All temporary dead ends included in future development plans must include signage <br />stating "Future Through Street" and a temporary cul-de-sac when the street will <br />have driveway access. <br />8. Work with Elk River Municipal Utilities (ERMU) to adjust overhead power poles to <br />support the development and future frontage road along Highway 10. <br />9. ERMU requires a per -lot streetlight fee. <br />Page 6 of 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.