Laserfiche WebLink
229446v1 <br />credit to pay any costs. No development, utility or street construction will be allowed and no building permits will <br />be issued unless the plat is in full compliance with the approved erosion control plan. <br />14. GRADING. The plat shall be graded in accordance with the approved grading development and <br />erosion control plan, Plan “B”. The plan shall conform to City of Elk River specifications. Within thirty (30) days <br />after completion of the grading and before the City approves individual building permits (except six (6) model home <br />permits on lots acceptable to the Building Official), the Developer shall provide the City with an “as constructed” <br />grading plan certified by a registered land surveyor or engineer that all storm water treatment/infiltration basins and <br />swales, have been constructed on public easements or land owned by the City. The “as constructed” plan shall <br />include field verified elevations of the following: a) cross sections of storm water treatment/infiltration basins; b) <br />location and elevations along all swales, wetlands, wetland mitigation areas if any, locations and dimensions of <br />borrow areas/stockpiles, and installed “conservation area” posts; and c) lot corner elevations and house pads, and <br />all other items listed in City Code. The City will withhold issuance of building permits until the approved certified <br />grading plan is on file with the City and all erosion control measures are in place as determined by the City Engineer. <br />The Developer certifies to the City that all lots with house footings placed on fill have been monitored and <br />constructed to meet or exceed FHA/HUD 79G specifications. The soils observation and testing report, including <br />referenced development phases and lot descriptions, shall be submitted to the Building Official for review prior to <br />the issuance of building permits. <br />Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished to the City to <br />guarantee compliance with the erosion control and grading requirements and the submittal of an as-built <br />certificate of survey. Prior to the release of the required individual lot grading and erosion control security that is <br />submitted with the building permit, an as-built certificate of survey for single family lots must be submitted to verify <br />that the final as-built grades and elevations of the specific lot and all building setbacks are consistent with the <br />approved grading plan for the development, and amendments thereto as approved by the City Engineer, and that <br />all required property monuments are in place. If the final grading, erosion control and as-built survey is not timely <br />completed, the City may, upon ten (10) days written notice, enter the lot, perform the work, and apply the cash <br />Page 69 of 299