My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 07-07-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
07-07-2025
>
8.1 SR 07-07-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 12:47:06 PM
Creation date
7/9/2025 12:47:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />229446v1 <br />4476897.v2 <br />construction will be allowed and no building permits will be issued unless the plat is in full compliance with the <br />approved erosion control plan. <br /> 14. GRADING. The plat shall be graded in accordance with the approved grading development <br />and erosion control plan, Plan “B”. The plan shall conform to City of Elk River specifications. Within thirty (30) <br />days after completion of the grading and before the City approves individual building permits (except three (3) <br />model home permits on lots acceptable to the Building Official), the Developer shall provide the City with an <br />“as constructed” grading plan certified by a registered land surveyor or engineer that all storm water <br />treatment/infiltration basins and swales, have been constructed on public easements or land owned by the <br />City. The “as constructed” plan shall include field verified elevations of the following: a) cross sections of <br />storm water treatment/infiltration basins; b) location and elevations along all swales, wetlands, wetland <br />mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed “conservation area” <br />posts; and c) lot corner elevations and house pads, and all other items listed in City Code. The City will <br />withhold issuance of building permits until the approved certified grading plan is on file with the City and all <br />erosion control measures are in place as determined by the City Engineer. The Developer certifies to the City <br />that all lots with house footings placed on fill have been monitored and constructed to meet or exceed <br />FHA/HUD 79G specifications. The soils observation and testing report, including referenced development <br />phases and lot descriptions, shall be submitted to the Building Official for review prior to the issuance of <br />building permits. <br /> Before a building permit is issued, a cash escrow of $1,000.00 per lot shall be furnished to the City <br />to guarantee compliance with the erosion control and grading requirements and the submittal of an as-built <br />certificate of survey. Prior to the release of the required individual lot grading and erosion control security that <br />is submitted with the building permit, an as-built certificate of survey for single family lots must be submitted to <br />verify that the final as-built grades and elevations of the specific lot and all building setbacks are consistent <br />with the approved grading plan for the development, and amendments thereto as approved by the City <br />Engineer, and that all required property monuments are in place. If the final grading, erosion control and as- <br />built survey is not timely completed, the City may enter the lot, perform the work, and apply the cash escrow <br />Page 223 of 309
The URL can be used to link to this page
Your browser does not support the video tag.