My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 07-07-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
07-07-2025
>
8.1 SR 07-07-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2025 12:47:06 PM
Creation date
7/9/2025 12:47:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILS^/dd/>^ϳ͘Ϯ2:31 PMN:\Projects Current\24-0120.00 TCLD Ranch Road\Civil\CAD Files\Phase 1 CAD\P1 CoverSWPPPDetails.dwg5/27/2025DESCRIPTIONDATENO.REVFILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: ^,dEK͘LAND SURVEYINGCIVIL ENGINEERINGENVIRONMENTAL SERVICES13076 FIRST STREET, BECKER, MN 55308-9322TEL: 763-262-8822 FAX: 763-262-8844BOGART, PEDERSON& ASSOCIATES, INC.DKt^tdEs>KWDEdϭ^d/d/KEŝƚLJŽĨůŬZŝǀĞƌ͕^ŚĞƌďƵƌŶĞŽƵŶƚLJ͕DE05/27/202524-0120.00MJM, CJDMJMMJM1 05/27/2025 1ST ADDITION PLANSI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly LicensedProfessional Engineer under the laws of theState of Minnesota.Signed:Date: Lic. No.Christopher J. Dahn5862805/27/2025^,DKt^td EINFILTRATION BASINN.T.S.EMERGENCY OVERFLOW(PER GRADING PLAN)NOTE:SEE GRADING AND EROSION CONTROL PLANS FOR ADDITIONAL INFORMATION ONLOCATION OF INLET STRUCTURES, EMERGENCY OVERFLOW, ELEVATIONS, ETC.FLARED END SECTION(PER UTILITY PLAN)UNCOMPACTED NATIVE PERMEABLE SOILSSEEDING WITH SEED MIX33-261 (35 LB/AC)EROSION CONTROL BLANKET (STRAW, CATEGORY 3N)5' MIN.SLOPE PER GRADING PLANFLEXAMAT(PER GRADING PLAN)GENERAL NOTES:1. INSTALL ALL TEMPORARY EROSION CONTROL MEASURES (IN ACCORDANCE WITHMnDOT GENERAL CONDITIONS 2573) PRIOR TO THE START OF ANY CONSTRUCTIONOPERATION THAT MAY CAUSE ANY SEDIMENTATION OR SILTATION AT THE SITE.2. INSTALL STORM DRAIN INLET PROTECTION TO PREVENT CLOGGING OF THE STORMSEWER AND SEDIMENT LOADS TO DOWNSTREAM STORM WATER FACILITIES ORWATERBODIES.3. IF THE STORMWATER BMP IS BEING DESIGNED TO SERVE AS A TEMPORARYSEDIMENT BASIN, GRADE THE BMP TO WITHIN THREE (3) FEET OF FINAL GRADE TOPROTECT THE UNDERLYING MATERIAL FROM CLOGGING. ONCE CONSTRUCTION INTHE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETED AND THE SITE ISSTABILIZED, EXCAVATE THE INFILTRATION BASIN TO FINAL GRADE AND COMPLETECONSTRUCTION OF THE BMP.4. GRADING OF THE INFILTRATION BASIN SHALL BE ACCOMPLISHED USINGLOW-IMPACT EARTH-MOVING EQUIPMENT TO PREVENT COMPACTION OF THEUNDERLYING SOILS. SMALL TRACKED DOZERS AND BOBCATS WITH RUNNERTRACKS ARE RECOMMENDED.5. EXCAVATE THE INFILTRATION BASIN TO THE SPECIFIED DEPTH (ELEVATION). IT ISRECOMMENDED THAT ALL SUB MATERIAL BELOW THE SPECIFIED ELEVATIONSHALL BE LEFT UNDISTURBED, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.6. GRADE TO THE DEPTH (ELEVATION) SPECIFIED IN THE CONSTRUCTIONDOCUMENTS UNLESS OTHERWISE DIRECTED BY THE ENGINEER.7. IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING ORIMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL WILL NEED TO BEREMOVED FROM THE BASIN PRIOR TO INITIATING THE NEXT STEP IN THECONSTRUCTION PROCESS. SEDIMENT THAT HAS BEEN WASHED INTO THE BASINDURING THE EXCAVATION PROCESS CAN SEAL THE PERMEABLE MATERIAL,SIGNIFICANTLY REDUCING THE INFILTRATION CAPACITY OF THE SOILS.8. SEEDING AND INSTALLATION OF EROSION CONTROL BLANKET SHALL BECOMPLETED WITHIN 48 HOURS OF FINAL GRADING.9. INFILTRATION AREA SHALL BE STAKED OFF DURING CONSTRUCTION TO RESTRICTHEAVY EQUIPEMENT TRAFFIC FROM COMPACTING NATIVE SOILS.CONSTRUCTION SEQUENCING:1. PERFORM CONTINUOUS INSPECTIONS OF EROSIONCONTROL PRACTICES.2. INSTALL SILT FENCE ALONG THE PERIMETER OF THE SITETO PREVENT SEDIMENT FROM LEAVING THE SITE DURINGTHE CONSTRUCTION PROCESS.3. ALL DOWNGRADIENT PERIMETER SEDIMENT-CONTROLBMPS MUST BE IN PLACE BEFORE ANY UP GRADIENTLAND-DISTURBING ACTIVITY BEGINS.4. REMOVE TOPSOIL FROM THE SITE AND PLACE INTEMPORARY STOCKPILE LOCATION. TEMPORARY SEEDTHE STOCKPILE.5. INSTALL UNDERGROUND UTILITIES (WATER, SANITARYSEWER, ELECTRIC AND PHONES) TAKING THE LOCATIONAND FUNCTION OF STORM WATER BMPS INTOCONSIDERATION.7. SEED AND MULCH DISTURBED AREAS ON SITE.8. CONSTRUCT THE ROADS TAKING THE LOCATION ANDFUNCTION OF STORM WATER BMPS INTO CONSIDERATION.9. PERFORM ALL OTHER SITE IMPROVEMENTS TAKING THELOCATION AND FUNCTION OF THE STORM WATER BMPSINTO CONSIDERATION.10. FINAL GRADE THE SITE.11. STABILIZE THE SITE BY IMPLEMENTING THE NATIVESEEDING AND PLANTING PORTION OF THE LANDSCAPINGPLAN.12. INSTALL THE EROSION CONTROL BLANKET13. REMOVE THE SILT FENCE AFTER THE SITE IS STABILIZEDPER PROJECT ENGINEER APPROVAL.FLEXAMAT INLET PROTECTION(SEE GRADING PLAN)INLET PIPE1. THE SEDIMENT LOGS SHALL BE TRENCHED 4" INTO THE GROUND ANDSHALL BE STAKED BY STEEL FENCE POSTS OR 2"X 2" WOOD STAKES.2. SOIL SHALL BE COMPACTED ON THE UPSLOPE SIDE OF LOGS.COMPACTED SOIL TOPREVENT PIPINGSEDIMENT-LADEN RUNOFFSTAKED AND ENTRENCHED 10" DIA.SEDIMENT LOGFILTERED RUNOFFEROSION CONTROLBLANKETTEMPORARY SEDIMENT LOGSN.T.S.9"6"GREEN LETTERING ONWHITE BACKGROUND3/4"3/8"FINISHED GROUND LINE1 1/2IN X 1 1/2INSIGN POST48"WETLAND BUFFER SIGNN.T.S.36"Page 204 of 309
The URL can be used to link to this page
Your browser does not support the video tag.