Laserfiche WebLink
SHEET XSHEET X1ϱϭϭϴϳϰϮϲϯϭϯϰϱϲϳϴϭϬϵϮϭϬϵϭ1KƵƚůŽƚSHEET X.2SHEET X.1970970980980980990990972972974974976976978978978982982982984984986986988988992992970972974976978970966968 <br />979797977977676767676767976960 970980962964966968972974976978964964966966968 <br />960962964980972974976978982971SSS99099299463+29.5842+0043+0044+0045+0046+0047+0048+004 9 +0 0 50+0051+0052+0053+0054+0055+0056+0057+0058+0059+0060+0061+0062+0063+00SSSSSS <br />S <br />SSSS <br />SSSSSSS <br />S <br />VVV963.5970972974976978969SSSSFSFSFSFSFSFSFSFSFSFSFSFSFSF <br />SFSFSFSF <br />SF <br />SFSFSFSFSF <br />SFSFSF <br />SFSFSFSF SFSFSFSF <br />SF <br />SF <br />SFSFSF <br />SFSF <br />SFSFSFSF SFSFSF <br />SF SFSFSFSFSFSFSF <br />SF SFSFSFSFSF <br />SFSFSF <br />SFSFSFSF SFSFSF <br />SF SF <br />SFSFSFSFSFSF <br />SF SFSFSFSFSFSFSF <br />SFSFSFSFSF SFSF SFSF <br />SFSFSFINSTALL 630 SY OF EROSIONCONTROL BLANKETINSTALL 680 SY OF EROSIONCONTROL BLANKETINSTALL 550 SY OF EROSIONCONTROL BLANKETINSTALL 2,075 SY OF EROSIONCONTROL BLANKETINSTALL 1,870 SY OF EROSIONCONTROL BLANKETINSTALL 620 SY OF EROSIONCONTROL BLANKETINSTALL 1,570 SY OF EROSIONCONTROL BLANKETINSTALL 535 SY OF EROSIONCONTROL BLANKETINSTALL 360 SY OF EROSIONCONTROL BLANKETINSTALL ROCK CONSTRUCTION ENTRANCE/EXITINSTALL 20 LF DITCH CHECKINSTALL 20 LF DITCH CHECKINSTALL 20 LF DITCH CHECKINSTALL 348 LF OF TEMP. SILT FENCEINSTALL 493 LF OF TEMP. SILT FENCEINSTALL 274 LF OF TEMP. SILT FENCEINSTALL 411 LF OF TEMP. SILT FENCEINSTALL 5485 LF OF TEMP. SILT FENCEINSTALL 390 LF OF TEMP. SILT FENCEINSTALL 2240 LF OF TEMP. SILT FENCEINSTALL 228 LF OF TEMP. SILT FENCESITE BASE^Khd,ZK^/KEKEdZK>W>Eϲ͘Ϯ2:31 PMN:\Projects Current\24-0120.00 TCLD Ranch Road\Civil\CAD Files\Phase 1 CAD\P1 Erosion Control.dwg5/27/2025DESCRIPTIONDATENO.REVFILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: ^,dEK͘LAND SURVEYINGCIVIL ENGINEERINGENVIRONMENTAL SERVICES13076 FIRST STREET, BECKER, MN 55308-9322TEL: 763-262-8822 FAX: 763-262-8844BOGART, PEDERSON& ASSOCIATES, INC.DKt^tdEs>KWDEdϭ^d/d/KEŝƚLJŽĨůŬZŝǀĞƌ͕^ŚĞƌďƵƌŶĞŽƵŶƚLJ͕DE05/27/202524-0120.00MJM, CJDMJMMJM1 05/27/2025 1ST ADDITION PLANSI hereby certify that this plan, specification, orreport was prepared by me or under my directsupervision and that I am a duly LicensedProfessional Engineer under the laws of theState of Minnesota.Signed:Date: Lic. No.Christopher J. Dahn5862805/27/2025SCALE:0'100' 200'1"=100'SFGRADING LIMITS AND PROPOSEDTEMPORARY SILT FENCETEMP. ROCK CONSTRUCTION ENTRANCEPROPOSED RIP RAPPROPOSED CONTOUREROSION CONTROL BLANKET (CAT. 20)EMERGENCY OVERFLOWE.O.F.>'E͗FIBER-LOG ROLLSZK^/KEKEdZK>EKd^͗1. CONTRACTOR SHALL CONFINE CONSTRUCTION OPERATIONSTO THE CONSTRUCTION/GRADING LIMITS SHOWN.2. ALL WORK SHALL CONFORM TO THE MINNESOTA POLLUTIONCONTROL AGENCY'S STORM WATER PERMIT REQUIREMENTS.CONTRACTOR SHALL OBTAIN ALL PERMITS AND COMPLY WITHALL PERMIT REQUIREMENTS.3. THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIESSHALL BE INSTALLED PRIOR TO ANY DEMOLITION OR GRADINGOPERATIONS AND MAINTAINED TO CONFORM WITH THESTANDARDS SPECIFIED BY THE PERMIT.4. INSTALL PERIMETER SILT FENCE AROUND INFILTRATIONBASINS WITHIN 48 HOURS OF FINAL GRADING OF RESPECTIVEBASIN.5. CONTRACTOR SHALL INSPECT TEMPORARY EROSIONCONTROL MEASURES ON THE ENTIRE SITE AT LEAST EVERY 7DAYS AND WITHIN 24 HOURS OF ANY MEASURABLERAINSTORM. DAMAGED SILT FENCE OR OTHER EROSIONCONTROL DEVICES OR PRACTICES SHALL BE REPAIREDIMMEDIATELY. INSPECTION AND MAINTENANCE OF DEVICESSHALL CONTINUE UNTIL THE SITE HAS UNDERGONE FINALSTABILIZATION AND A NOTICE OF TERMINATION IS SUBMITTEDTO THE MPCA.6. ALL GRADING OPERATIONS SHALL BE CONDUCTED IN AMANNER TO MINIMIZE THE POTENTIAL FOR SITE EROSION.7. THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIESSHALL BE INSTALLED AND MAINTAINED TO CONFORM WITHTHE STANDARDS SPECIFIED BY THE CITY OF ELK RIVER ANDTHE MPCA.8. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIORTO THE DISTURBANCE OF ANY AREAS AND MAINTAINED UNTILALL TRIBUTARY DISTURBED AREAS ARE RESTORED.9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEREMOVAL OF ALL EROSION CONTROL MEASURES, INCLUDINGSILT FENCE AND BALES, UPON ESTABLISHMENT OFPERMANENT VEGETATION IN SAID AREAS.10. ALL SOILS TRACKED ONTO PAVEMENT OR ANY OTHEROFF-SITE AREA SHALL BE REMOVED DAILY.11. THE SITE SEDIMENT CONTROL FACILITIES FOR THE PROJECTMUST BE INSTALLED PRIOR TO ANY GRADING OPERATION.12. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BERESTORED AND VEGETATED AS SOON AS POSSIBLE. ANYFINISHED AREAS SHALL BE SEEDED AND MULCHED WITHIN 7DAYS AFTER FINISHED GRADING IS COMPLETED INACCORDANCE TO MN/DOT 2575.13. ALL DISTURBED AREAS SHALL BE REVEGETATED WITH MN/DOTSEED MIX, MULCHED, FERTILIZED & DISK ANCHORED, PER THEFOLLOWING SCHEDULE:STANDARD SEED MIX 25-131: 220 LB/AC.INFILTRATION BASIN SEED MIX 33-261: 35 LB/AC.FERTILIZER 22-5-10: 350 LB/AC.MULCH TYPE 3: 2 TONS/AC.14. CONTRACTOR SHALL INSTALL TEMPORARY SEDIMENT BMP'SSHOWN AND NOT SHOWN ON PLANS DURING PHASING ONPROJECT TO COMPLY WITH MPCA, CITY INSPECTOR ANDDEVELOPER REQUEST.ZK^/KEKEdZK>s/^xSILT FENCE: 15,100 LFxBIOLOG: 1,020 LFxROCK CONSTRUCTION EXIT: 1 EACHxEROSION CONTROL BLANKET (CAT. 20): 12,470 S.Y.STANDARD SEED MIXINFILTRATION BASIN SEED MIXPage 201 of 309