My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1h ERMUSR 07-08-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025
>
07-08-2025
>
6.1h ERMUSR 07-08-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 1:01:15 PM
Creation date
7/7/2025 1:01:15 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br />TO: <br />ERMU Commission <br />FROM: <br />Dave Ninow – Water Superintendent <br />MEETING DATE: <br />July 8, 2025 <br />AGENDA ITEM NUMBER: <br />6.1h <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Delivered 14 new water meters, installed a Smart Point module, and took curb stop ties. <br />• Completed 20 BACTI/Total Chlorine Residual Samples. <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH. <br />• Completed 20 routine fluoride samples. <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report. <br />• Submitted Discharge Monitoring Report to the Minnesota Pollution Control Agency for <br />the Diesel Generation Plant. <br />• Completed and submitted annual cyber security assessment of our water system <br />operational technology to MDH. <br />• The Gary Street Water Tower was taken offline and completely drained to replace the <br />main isolation valve outside the tower and have the interior wet tank cleaned. Per <br />American Water Works Association standards, water towers should be washed out and <br />inspected at least once every three years. This process involves draining the tank, <br />removing debris and sediment, and scrubbing the interior. The tower has been <br />disinfected, refilled, bacteria tested and returned to service. The tower’s exterior was <br />completely pressure-washed as well (see attached photos). <br />• Road repairs have been completed for the water main break repair on Polk Street and <br />the water service leak repair on Business Center Drive. <br />• Water Quality Report clarification regarding the “Range” column in the regulated <br />substances chart in the report. The range column reflects the results of testing <br />performed, not a range of allowable limits. ERMU’s results fall well below the EPA limits <br />shown in the MCL (Maximum Contaminant Level) and MCLG (Maximum Contaminant <br />Level Goal) columns. MCLGs are non-enforceable public health goals, while MCLs are <br />legally enforceable limits for contaminants in drinking water. <br />• Eric Plude started on June 12 as a water department seasonal employee and will assist <br />with fire hydrant maintenance, water main valve exercising, and GIS mapping of water <br />system infrastructure. <br />88
The URL can be used to link to this page
Your browser does not support the video tag.