Laserfiche WebLink
<br />beckerarena.com <br />Quotation #: Elk River Fieldhouse Field House Upgrades <br />Revision #: 3 <br />Date: May 28, 2025 <br />Proposal Expiration Date: June 28, 2025 <br />Sales Consultant: Dan Mehren <br /> <br />Prepared For: Project Location: <br />Katie Harsted Furniture and Things Event Center <br />Furniture and Things Event Center 1000 School Street <br />1000 School Street Elk River MN 55330 <br />Elk River MN 55330 <br /> <br />Thank you for considering Becker Arena Products, Inc., we appreciate the opportunity… <br /> <br /> <br />Benefits of Choosing to Partner with Becker Arena Products <br /> <br />• A stable and reliable company since 1988 <br />• A staff with in-depth knowledge of the industry and products <br />• Quality products that last <br />• Experienced and professional installers <br />• Excellent customer service <br />• Worry Free Projects – Guaranteed <br /> <br />Per your request, please see the below revised pricing and information to both modify or replace the turf in the field house. All <br />material FOB Destination. All modifications to the existing turf to be completed onsite. Turf to remain onsite either in arena or <br />storage container/trailer outside arena. <br /> <br />Turf Modifications <br />Becker Arena Products will furnish turf materials and labor to upgrade the existing multi-purpose field house. Scope to include: <br />- All existing AT740 Sporturf to be cut at 12’ increments and rolled up. <br />- Install Velcro strips to existing AT740 Sporturf seams and perimeter (glued application) <br />- Install Velcro strips to exterior concrete along perimeter (glued application) <br />- Roll out and re-install turf. <br /> <br />COMPLETE INSTALLATION: <br />An approved Becker Arena Products Inc.® installation team will install the above-described turf modifications. Daily clean up and <br />maintenance of the site included. Installation is based on non-union/non-prevailing wage rates. <br /> <br />Total BASE Price (material, freight, installation) Accept _____ $ 127,557.00 <br /> <br />Breakdown: Turf Materials $ 11,134.00 <br /> Turf Labor $ 116,423.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 66 of 247