Laserfiche WebLink
Elk River, City of <BR>Meadowwoods Sanitary Sewer Connection<BR>24X.136841 (#9678946)Owner: City of Elk RiverSolicitor: Bolton & Menk, Inc.05/28/2025 01:00 PM CDTEngineer EstimateJ.R. Ferche, Inc.Northdale Construction Company, Inc.Minger Construction Co. Inc.New Look Contracting, Inc.Burski Excavating, Inc.Section TitleLine ItemItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionBASE BID$912,842.50$858,995.00$894,906.92$945,180.45########################1-MOBILIZATIONLUMP SUM1$60,000.00$60,000.00$66,000.00$66,000.00$56,582.00$56,582.00$81,645.00$81,645.00$36,200.00$36,200.00$200,000.00$200,000.002-TRAFFIC CONTROL LUMP SUM1$10,000.00$10,000.00$50,000.00$50,000.00$37,380.00$37,380.00$9,075.00$9,075.00$37,500.00$37,500.00$41,000.00$41,000.003-CLEAR AND GRUB TREESEACH8$10,000.00$80,000.00$550.00$4,400.00$525.00$4,200.00$250.00$2,000.00$1,325.00$10,600.00$200.00$1,600.004-REMOVE LIFT STATION & PUMPSEACH1$5,000.00$5,000.00$15,000.00$15,000.00$28,000.00$28,000.00$6,800.00$6,800.00$13,500.00$13,500.00$70,000.00$70,000.005-REMOVE FLARED END SECTIONEACH1$500.00$500.00$750.00$750.00$518.52$518.52$396.50$396.50$475.00$475.00$250.00$250.006-EXCAVATION - COMMON (EV) (P)CU YD637$20.00$12,740.00$30.00$19,110.00$41.48$26,422.76$17.00$10,829.00$18.00$11,466.00$45.00$28,665.007-BITUMINOUS PATCH (STREET)SQ YD250$60.00$15,000.00$85.00$21,250.00$83.68$20,920.00$103.05$25,762.50$135.00$33,750.00$80.00$20,000.008-AGGREGATE SURFACING CLASS 5CU YD10$50.00$500.00$85.00$850.00$56.99$569.90$106.95$1,069.50$100.00$1,000.00$35.00$350.009-7" CONCRETE PAVEMENTSQ FT610$20.00$12,200.00$20.00$12,200.00$20.94$12,773.40$17.85$10,888.50$20.00$12,200.00$20.00$12,200.0010-12" CONCRETE PAVEMENTSQ FT130$40.00$5,200.00$37.00$4,810.00$36.69$4,769.70$36.95$4,803.50$41.00$5,330.00$35.00$4,550.0011-BOLLARDEACH1$1,300.00$1,300.00$1,500.00$1,500.00$1,582.04$1,582.04$1,135.00$1,135.00$800.00$800.00$680.00$680.0012-CONNECT TO EXISTING SANITARY PIPE EACH3$1,000.00$3,000.00$6,500.00$19,500.00$9,360.58$28,081.74$12,250.00$36,750.00$2,300.00$6,900.00$20,000.00$60,000.0013-4" SANITARY FORCEMAIN (TRENCHLESS)LIN FT2100$50.00$105,000.00$54.00$113,400.00$35.05$73,605.00$39.50$82,950.00$70.00$147,000.00$50.00$105,000.0014-8" SANITARY SEWER (TRENCHLESS)LIN FT937$80.00$74,960.00$78.00$73,086.00$94.45$88,499.65$76.85$72,008.45$100.00$93,700.00$82.00$76,834.0015-CONSTRUCT LIFT STATION AND VALVE VAULTLUMP SUM1$425,000.00$425,000.00$330,000.00$330,000.00$382,966.00$382,966.00$433,725.00$433,725.00$435,000.00$435,000.00$497,000.00$497,000.0016-ELECTRICAL GENERATORLUMP SUM1$45,000.00$45,000.00$69,900.00$69,900.00$62,832.00$62,832.00$75,820.00$75,820.00$68,000.00$68,000.00$81,700.00$81,700.0017-SANITARY MANHOLELIN FT44$600.00$26,400.00$565.00$24,860.00$738.88$32,510.72$1,323.00$58,212.00$2,500.00$110,000.00$1,500.00$66,000.0018-SANITARY MANHOLE CASTINGEACH3$1,500.00$4,500.00$1,200.00$3,600.00$2,036.57$6,109.71$1,610.00$4,830.00$975.00$2,925.00$750.00$2,250.0019-CONNECT TO EXISTING STORM PIPEEACH1$1,000.00$1,000.00$750.00$750.00$2,022.50$2,022.50$1,165.00$1,165.00$1,000.00$1,000.00$1,200.00$1,200.0020-15" RC PIPE CLASS VLIN FT43$75.00$3,225.00$114.00$4,902.00$99.49$4,278.07$115.00$4,945.00$88.00$3,784.00$80.00$3,440.0021-15" PIPE APRON W/ TRASH GUARDEACH1$1,800.00$1,800.00$2,950.00$2,950.00$2,487.06$2,487.06$2,940.00$2,940.00$1,700.00$1,700.00$2,500.00$2,500.0022-RIP RAP CLASS IIICU YD16$150.00$2,400.00$125.00$2,000.00$207.25$3,316.00$138.00$2,208.00$150.00$2,400.00$125.00$2,000.0023-STORM DRAIN INLET PROTECTIONEACH5$300.00$1,500.00$200.00$1,000.00$259.26$1,296.30$173.00$865.00$175.00$875.00$212.00$1,060.0024-SEEDINGACRE0.8$4,000.00$3,200.00$2,500.00$2,000.00$1,575.00$1,260.00$1,670.00$1,336.00$1,500.00$1,200.00$700.00$560.0025-SEED SANDY INSLOPEPOUND78$5.00$390.00$9.00$702.00$8.45$659.10$9.00$702.00$10.00$780.00$9.00$702.0026-EROSION CONTROL BLANKET - CATEGORY 3NSQ YD630$2.25$1,417.50$5.00$3,150.00$2.05$1,291.50$2.15$1,354.50$2.75$1,732.50$2.00$1,260.0027-HYDRAULIC BONDED FIBER MATRIXPOUND2800$2.00$5,600.00$1.50$4,200.00$1.42$3,976.00$1.50$4,200.00$1.75$4,900.00$2.00$5,600.0028-LOAM TOPSOIL BORROW (LV)CU YD85$52.00$4,420.00$55.00$4,675.00$51.85$4,407.25$44.00$3,740.00$0.10$8.50$50.00$4,250.0029-SEDIMENT CONTROL LOG TYPE WOOD FIBERLIN FT300$3.50$1,050.00$5.50$1,650.00$3.20$960.00$3.40$1,020.00$4.00$1,200.00$3.75$1,125.0030-4" SOLID LINE MULTI COMPLIN FT100$3.00$300.00$4.00$400.00$3.15$315.00$11.15$1,115.00$17.00$1,700.00$7.00$700.0031-24" SOLID LINE MULTI COMPLIN FT20$12.00$240.00$20.00$400.00$15.75$315.00$44.50$890.00$57.00$1,140.00$41.00$820.00Base Bid Total:$912,842.50$858,995.00$894,906.92$945,180.45########################Page 70 of 637