<br />ARTICLE 1.1 INITIAL INFORMATION <br />~ 1.1.1 This Agreement is based on the following information and assumptions. <br />(Note the disposition for the following items by inserting the requested information or a statement such as "not <br />applicable." "unknown at time of execution" or "to be determined later by mutual agreement. ") <br /> <br />~ 1.1.2 PROJECT PARAMETERS <br />~ 1.1.2.1 The objective or use is: <br />(Identify or describe, if appropriate, proposed use or goals.) <br /> <br />New Library <br /> <br />~ 1.1.2.2 The physical parameters are: <br />(Identify or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical <br />reports about the site.) <br /> <br />Single story. 16.000 s.f. building to be located southeast of Orono Parkway. See Appendix 'CO. <br /> <br />~ 1.1.2.3 The Owner's Program is: <br />(Identify documentation or state the manner in which the program will be developed.) <br /> <br />We will be reviewing program with GRRL. See Appendix D. <br /> <br />~ 1.1.2.4 The legal parameters are: <br />(Identify pertinent legal information, including, if appropriate. land surveys and legal descriptions and restrictions <br />of the site.) <br /> <br />The project will be built on land provided and owned bv the City of Elk River. <br /> <br />~ 1.1.2.5 The financial parameters are as follows. <br />.1 Amount of the Owner's overall budget for the Project, including the Architect's compensation, is: <br />$3.830.000 million for the a\>\>roximate!v 16.000 s.f. library proiect. See Appendix G. <br /> <br />.2 Amount of the Owner's budget for the Cost of the Work, excluding the Architect's compensation, is: <br />unknown at time of execution of this Ag:reement <br /> <br />~ 1.1.2.6 The time parameters are: <br />(Identify, if appropriate. milestone dates, durations or fast track scheduling.) <br /> <br />Schematic Desig:n start in March 2006. <br />Construction Start in 2006. See Appendix E. <br /> <br />~ 1.1.2.7 The proposed procurement or delivery method for the Project is: <br />(Identify method such as competitive bid, negotiated contract, or construction management.) <br /> <br />The new library will be competitive bid to a general contractor. <br /> <br />~ 1.1.2.8 Other parameters are: <br />(Identify special characteristics or needs of the Project such as energy, environmental or historic preservation <br />requirements. ) <br /> <br />The project will proceed towards a g:oal of LEED Certification. Cost imoacts and goals are to be evaluated at the <br />end of Schematic Design. See Appendix F. <br /> <br />~ 1.1.3 PROJECT TEAM <br />~ 1.1.3.1 The Owner's Designated Representative is: <br /> <br />AlA Document B141™ -1997 Part 1. Copyright @ 1917, 1926, 1948, 1951, 1953. 1958, 1961, 1963, 1966, 1967, 1970, 1974,1977,1987 and 1997 by The <br />American Institute of Architects. All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright Law and International Treaties. 2 <br />Unauthorized reproduction or distribution of this AlA'" Document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:54:39 on 03115/2006 under Order <br />NO.1 000195323_9 which expires on 9/8/2006, and is not for resale. <br />User Notes: (1759163019) <br />