My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.12. SR 03-20-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
03/20/2006
>
3.12. SR 03-20-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:50 AM
Creation date
3/17/2006 7:40:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\'=:AIA Document 8141'" -1997 Part 2 <br /> <br />Standard Form of Architect's Services: <br />Design and Contract Administration <br /> <br />TABLE OF ARTICLES <br /> <br />2.1 PROJECT ADMINISTRATION SERVICES <br />2.2 SUPPORTING SERVICES <br />2.3 EVALUATION AND PLANNING SERVICES <br />2.4 DESIGN SERVICES <br />2.5 CONSTRUCTION PROCUREMENT SERVICES <br />2.6 CONTRACT ADMINISTRATION SERVICES <br />2.7 FACILITY OPERATION SERVICES <br />2.8 SCHEDULE OF SERVICES <br />2.9 MODIFICATIONS <br /> <br />This document has important <br />legal consequences. <br />Consultation with an attorney <br />is encouraged with respect to <br />its completion or modification. <br /> <br />ARTICLE 2.1 PROJECT ADMINISTRATION SERVICES <br />~ 2.1.1 The Architect shall manage the Architect's services and administer the Project. The <br />Architect shall consult with the Owner, research applicable design criteria, attend Project <br />meetings, communicate with members of the Project team and issue progress reports. The <br />Architect shall coordinate the services provided by the Architect and the Architect's <br />consultants with those services provided by the Owner and the Owner's consultants. <br /> <br />~ 2.1.2 When Project requirements have been sufficiently identified, the Architect shall <br />prepare, and periodically update, a Project schedule that shall identify milestone dates for <br />decisions required of the Owner, design services furnished by the Architect, completion of <br />documentation provided by the Architect, commencement of construction and Substantial <br />Completion of the Work. <br /> <br />~ 2.1.3 The Architect shall consider the value of alternative materials, building systems and <br />equipment, together with other considerations based on program, budget and aesthetics in <br />developing the design for the Project. <br /> <br />~ 2.1.4 Upon request of the Owner, the Architect shall make a presentation to explain the <br />design of the Project to representatives of the Owner. <br /> <br />~ 2.1.5 The Architect shall submit design documents to the Owner at intervals appropriate <br />to the design process for purposes of evaluation and approval by the Owner. The Architect <br />shall be entitled to rely on approvals received from the Owner in the further development <br />of the design. <br /> <br />~ 2.1.6 The Architect shall assist the Owner in connection with the Owner's responsibility <br /> <br />for filing documents required for the approval of governmental authorities having <br /> <br />jurisdiction over the Project. <br /> <br />AlA Document 81411>> -1997 Part 2. Copyright @ 1917, 1926, 1948, 1951, 1953, 1958, 1961,1963, 1966, 1967, 1970, 1974, 1977, 1987 and 1997 by The <br />American Institute of Architects. All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright Law and International Treaties. 1 <br />Unauthorized reproduction or distribution of this AlA'" Document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 16:04:21 on 03/15/2006 under Order <br />NO.1 000195323_9 which expires on 9/8/2006, and is nollor resale. <br />User Notes: (1950708717) <br />
The URL can be used to link to this page
Your browser does not support the video tag.