Laserfiche WebLink
<br />I 93RD AVENUE CORRIDOR STUDY <br />INFORMATIONAL MEETINGS <br /> <br />Tuesday, january 24, 2006 <br />Wednesday, january 25, 2006 <br /> <br />SUMMARY OF MAJOR POINTS <br /> <br />A. Tuesday. January 24. 2006 <br /> <br />The major questions raised at the inforinational meeting were as follows: <br /> <br />1. How many properties are affected by each option. <br />2. Questions concerning the design of the roadway; two-lane versus four-lane. <br />3. Questions concerning the upgrade and construction of interchanges on 1H 169 <br />4. Questions regarding how the decision will be made as to which option is chosen. <br />5. How the land acquisition process works. <br />6. Questions relative to the total cost of the proposed project. <br />7. Questions relative to how 193rd Avenue was chosen over Elk Hills Drive or 197th <br />Avenue. <br /> <br />B. Wednesday. January 25. 2006 <br /> <br />The major issues at this informational meeting were as follows: <br /> <br />1. The amount of traffic this will add to the existing 193rd Avenue corridor. <br />2. The speed and safety of the street with this much additional traffic. <br />3. Why Elk Hills Drive was not looked at instead of or with 193rd Avenue. <br />4. How the process would proceed from here and at what points would decisions be <br />made by the City Council. <br />5. What the design of 193rd Avenue would look like - Would it be widened or just <br />restriped. <br />6. What the traffic control would be like at 193rd Avenue and Evans Street. <br />7. Discussion on level of service at intersections relative to the Elk Ridge Center traffic <br />study. <br />8. Discussion about Comprehensive Plan and Transportation Plan relative to this <br />proJect. <br />9. Questions and discussions regarding the 1H 169 Inter-Regional Corridor Study. <br /> <br />S:\EngineerImprovProj\2006 Improvement Projects \193rd Ave Corridor\Info mtg summary.doc <br />