My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Updated Parks and Recreation Commission Meeting Packet 06-11-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2025
>
06-11-2025
>
Updated Parks and Recreation Commission Meeting Packet 06-11-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 5:08:47 PM
Creation date
6/10/2025 5:01:19 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
6/11/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 5: How We Get There 48 <br /> <br />Future <br />County <br />Road <br />City Owned Property <br />-Guided Industrial which allows park uses- <br />High Quality Lighted <br />Softball Fields <br />Batting Cages <br />Parking lot to serve Softball Wheel <br />and Soccer / FB fields <br />Pave Parking Lot <br />Perimeter Trail <br />Covered dugouts <br />90’ Basepath Lighted <br />Baseball Fields <br />Complete building upgrades and <br />add restrooms and water <br />Park Sign Future County Road(per Elk River Comprehensive Plan)Expansion of lighted open field <br />(soccer/FB/Lax/Etc.) area <br />Trail with boardwalk over wetland <br />Existing <br />Lighted <br />Field <br />Playground <br />Playground <br />165th <br />Shed / Maintenance / Storage <br />Loop Trail <br />Shed / Maintenance / Storage <br />Future Industrial <br />Development <br />Future Industrial <br />Development <br />Future Industrial <br />Development <br />Future Industrial <br />Development <br />Future Industrial <br />Development <br />Concessions / Restrooms / Storm Shelter <br />P <br />P <br />P <br />* <br />Park Sign <br />Former 165th Alignment <br />Realigned 165th <br />At 27-30 Acres, the YAC Expansion Area <br />takes 22-25% of the available land in the <br />City Owned Property immediately north of <br />the current YAC boundaries, leaving 120+ <br />acres for future industrial development. <br />An alternative layout <br />involves a pinwheel <br />of high quality 60-75’ <br />basepath lighted <br />baseball fields and <br />a 90’ basepath <br />destination baseball <br />field. The lighted <br />open field expansion <br />would feature <br />overlapping fields. <br />YAC Park <br />Expansion <br />Existing YAC Park <br />Private <br />getting thereFigure 5.2 Signature Park Concept Youth Athletic Complex <br />Page 116 of 240
The URL can be used to link to this page
Your browser does not support the video tag.