My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.8 SR 05-19-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
05-19-2025
>
4.8 SR 05-19-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 10:37:57 AM
Creation date
5/29/2025 10:37:57 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/19/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Land will be zoned into the PUD zoning district only upon approval ofa concept plan for the PUD, pursuant tothe <br />procedure set forth in this section. A PUD will be authorized onland in a PUD zoning district only upon issuance of a <br />conditional use permit, pursuant to the procedure set forth in this section. <br />The applicant has submitted a PUD concept plan as part of their application package. The plan includes a <br />ministorage facility, commercial uses, light industrial, and a proposal to retain the existing billboard. The <br />concept plan includes potential parking and drive areas within the property, and impacts to a portion of <br />the city owned lot south of the project. The proposed impacts on the city owned lot are not being <br />considered as part of this request and any future impacts to the city parcel will need additional reviews and <br />approvals from the City Council. <br />2. The uses allowed in aPUD shall be limited to land uses consistent with the city's comprehensive plan and land use map, <br />and tothose uses identified in the concept plan for the PUD zoning district and the conditional use permit for the PUD. <br />An update to the Comprehensive Plan isincluded in the current application package. Approval of this <br />update will establish consistency with the proposed uses in the PUD concept plan and the Comprehensive <br />Plan. The uses will be outlined in the PUD Agreement and future development within the district will <br />utilize the Conditional Use Permit process toensure consistency with city ordinances and the proposed <br />plan. <br />3. The area ofland to be included ina PUD shall be inuniform control ofthe applicant. <br />The concept plan includes a future street that is on city owned property. This improvement will require <br />additional approval from the Council. Those approvals have not been requested at this time, and future <br />improvements will not be authorized until that occurs. The previously proposed improvements within the <br />right-of-way have been removed with the current construction plans. <br />4. A PUD shall bedesigned to form a desirable unified environment within its proposed boundaries, including uniform design <br />elements, landscaping, lighting and signage. <br />The current concept plan is designed as one plan, toinclude drainage guidance for stormwater ponds and <br />possible wetland impacts. The wetland delineation has been reviewed and approved bythe city and state, <br />butimpacts to the wetland will require additional approvals. <br />5. A PUD shall not cause undesirable impacts on adjacent lands and land uses. Inparticular, uses on the PUD perimeter <br />shall be compatible with adjacent uses outside the PUD. <br />Nearby land uses include industrial and commercial uses similar to those proposed within the proposed <br />PUD. The existing uses are consistent with surrounding properties. <br />6. A PUD shall be served byadequate transportation, water, sanitary sewer and drainage systems. <br />The project area will beserved bypublic services and detailed plans will be reviewed with each phase of <br />the project. The PUD agreement will require all future improvements tofollow the CUP process to <br />ensure the project area adequately accounts for the proposed impacts. <br />7. A PUD shall not adversely affect existing orproposed parks, schools, streets orother public facilities. <br />The current use proposed with this first phase of the PUD project proposes a single connection tothe <br />east half of a future 4-lane divided roadway. This connection will bereduced to a right-in-right-out at full <br />build out of the roadway. The full development of the surrounding road network will support the <br />proposed uses, and this proposed first phase does not adversely affect the existing public facilities. Full <br />development of the concept plan will also require additional public street improvements toprovide access <br />to the uses in the southwest corner of the concept plan. <br />Page 94 of 197
The URL can be used to link to this page
Your browser does not support the video tag.