Laserfiche WebLink
15.4 Dual 7 pins standard SAE type, end of frame (1) for trailer with electric <br />brakes, (1) for trailer with air brakes $213.00 $- <br />15.5 Hand control valve for trailer brakes $48.00 $- <br />15.9 1 <br />16.0 MANUALS / TRADE-IN INTEREST FEE:1 <br />16.1 <br />Percent interest per month (non-compounding) on unpaid cab & chassis <br />balance. Applies only to CPV Members. (Payable after trade-in is <br />delivered to vendor). Percentage/per month. <br />16.3 Manuals in print form, parts repair and service, per set No Bid <br />16.4 Premium Tech Tool $4,000.00 $- <br />16.9 1 <br />17.0 Delivery Charges:1 <br />Price per loaded mile Starting Point 1 <br />17.1 Roseville, MN 55113 $2.50 $- <br />17.9 1 <br />18.0 Maintenance/ Body Shop Labor rates 1 <br />18.1 Rate for Initial Inspection/Diagnostoce $195.00 $- <br />18.2 Rate for Mechanical Work $195.00 $- <br />18.3 Rate for Body Work $195.00 $- <br />18.9 1 <br />19.0 Quantity Discounts:1 <br />1 <br />20 Next Model Year Upcharges 1 <br />Enter the following Production Model Year here >>>>>>>>>2026 <br />20.1 Percentage Upcharge for the following Model Year Base Unit 1 2.00%$2,379.80 <br />20.2 Percentage Upcharge for the following Model Year Options 1 2.00%$876.24 <br />20.0 <br />Total Cost:$166,058.04 <br />Page 109 of 197