My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 04-07-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
04-07-2025 and Closed
>
8.2 SR 04-07-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 11:03:38 AM
Creation date
4/23/2025 11:03:38 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br />LSE anticipates beginning immediately after receiving a signed Letter of Engagement and the retainer. <br />ASSUMPTIONS AND CLARIFICATIONS <br />• Once the site is selected - Owner to provide site surveys showing boundaries, easements, topography, <br />utilities, roadways, existing construction/buildings, etc. <br />• Owner to provide geotechnical (soil,boringreport) information for use in design and documentation process. <br />This information is critical to get design team moving. <br />• A CM, once selected, will provide design and documentation level construction pricing based on knowledge <br />of the local construction market. Architect to review this information with Owner. <br />• Once site is selected - Owner to verify utility capacity. <br />• Furniture/ Fixtures/ Equipment (FF&E) is limited to initial conversation in this engagement letter. LSE wants to <br />discuss with you and your team in detail about full services of specifications, selection, and administration of <br />this item. <br />On behalf of LSE, we appreciate the opportunity to serve the City of Elk River on the design and ultimate <br />construction of this important project and we look forward to creating a dynamic solution for your team. Please <br />contact us should you have any questions or comments related to this Letter of Engagement. If this engagement <br />letter meets with your approval, please sign below and return one copy plus the retainer to our offices for our <br />records. LSE will work to develop an AIA B101 agreement for full execution and signature. <br />LSE Architects Inc. <br />uintin J. Scott, , AIA <br />President I Principal Architect <br />Approved: <br />Brian Tempas, AIA <br />Principal I Sr. Architect <br />City Representative (title) Date <br />Cc: Mohammed Lawal, FAIA <br />Brenda West, Interior Designer <br />Attachments: EXHIBIT -A LSE Reimbursable Expenses <br />EXHIBIT - B LSE Hourly Rates <br />III,,. IE' IIh'�III ril:..:c" , III 1401 Glenwood Ave. <br />Minneapolis, MN 5.5405 <br />I...SE Ardhftects.corn <br />(612) 343.1010 <br />Page 185 of 249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.