Laserfiche WebLink
Currently, the developer is seeking the approval of the PUD to establish the framework for the project. <br />Future applications and reviews by the city will include a preliminary plat, which will provide more details on <br />the grading, stormwater, utility work, and engineering for the development. <br />Approved conditions should seek to achieve a cohesive project with a series of standards that the developer <br />will follow as the project progresses towards final design. <br />Comprehensive Plan <br />The Comprehensive Plan guides the site for Mixed Residential and Highway Business uses. The proposal <br />maintains the same land use classifications but re -aligns the areas to match the property lines proposed with <br />the project. <br />The proposed commercial areas and future uses align with the land use guidance, and realigning the land use <br />plan to follow the proposed uses is supported by staff. <br />The mixed residential category supports a range of housing types, with the goal of a gentle increase in density <br />when compared to a typical single-family neighborhood. While the proposal doesn't include townhomes or <br />multifamily uses, the smallest single-family parcels are 50 feet wide, which increases the overall density of the <br />area. <br />Access and Streets <br />The development is located between Highway 10 and the Mississippi River and abuts the Oliver Kelley Farm <br />historic site along the southern boundary. The main access to the site will be from an improved access point <br />at Highway 10 and 165th Ave. This is the current location of the driveway serving the property. City staff, the <br />developer, and the City Council have been working with MnDOT to design the interchange. The project is <br />contingent upon MnDOT's approval and development of this interchange, as the developer will need an <br />access permit to begin development. <br />Additional access to the development includes an extension of the existing Yale Street dead-end at the north <br />end of the project and a frontage road along Highway 10. <br />The project reserves land for a future interchange, but that is not part of this project. It is anticipated that the <br />improvements at 1651h Ave will provide access for the foreseeable future, and the interchange will be <br />constructed when funding and traffic demands allow. <br />Internal circulation is provided by public streets; there are no private drives included in the project. A <br />sidewalk is included on one side of each residential street, including the frontage road. Plans also include a 10- <br />foot trail running through the development, which meets the city's long-term goal of connecting to the <br />Mississippi River Trail in Ramsey. <br />The developer had originally requested a narrower street section for many of the interior streets. However, <br />after discussions with the Planning Commission and the City Council, the developer agreed to follow the city <br />design standards and construct all streets at 34 feet wide. <br />City Utilities <br />All parcels will be served by city sewer and water. This will require the extension of existing trunk services, <br />which are the developer's responsibility. Additional details regarding city services will be included in a future <br />preliminary plat application. <br />Housing Types <br />The proposal includes four different lot sizes, ranging in size from 50-foot-wide lots with a 35-foot-wide <br />Page 121 of 249 <br />