Laserfiche WebLink
• New chlorine gas alarm system equipment has been installed in the water treatment <br />plants to replace the aging equipment. The upgraded gas detection equipment is <br />designed to continuously monitor and detect gas leaks before they lead to harmful <br />conditions, ensuring the safety of our personnel and the facility. <br />• Derek Lutter has accepted the new water operator position within our growing water <br />department. This additional role was created to address the expanding needs of our <br />municipal water system and ensure that we continue to provide excellent service to our <br />community. He brings a wealth of experience and qualifications to the position. He <br />begins working with ERMU on April 8. <br />• We will begin flushing hydrants the week of April 14. Customers will be notified and a <br />map with the zones and dates for flushing will be made public. Flushing is expected to <br />take approximately 6 weeks. We are increasing the amount of time scheduled for <br />flushing due to the number of fire hydrants now in the distribution system. <br />ATTACHMENTS: <br />• March 2025 Pumping by Well <br />Page 2 of 2 <br />226 <br />