My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3 SR 03-17-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
03-17-2025
>
7.3 SR 03-17-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:26:26 PM
Creation date
3/27/2025 4:26:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Site Plan <br />The project includes one private cul-de-sac providing access to all six parcels, which are generally 60-feet <br />wide. Parking is provided on the driveway and with six parking stalls perpendicular to the private street. The <br />homes will be a minimum of 10-feet apart and maintenance will be addressed with an HOA. <br /> <br />Public Utilities <br />All six homes will be connected to city sewer and water. However, the sewer service requires a private lift <br />station to convey the effluent to the city's system. The city will not maintain this lift station, and the <br />development will connect to the public system near the intersection of 177th Ave and Fillmore Street. <br /> <br />The water main is located beneath the trail on the west side of Fillmore Street and the developer will need to <br />make two connections to provide the required loop of service. The water main providing service to this <br />phase was installed by the developer with the first phase of this subdivision, but ERMU reimbursed the <br />developer as the extension was for a looped service at the time. ERMU has requested reimbursement for this <br />cost as the extension is now providing service for this phase. These types of utility services are generally <br />installed at the developer's expense. <br /> <br />Ordinance Amendment <br />The proposed ordinance amendment will take the place of a PUD agreement. The standards of the previous <br />PUD agreement will be codified into city ordinances, providing more clarity and transparency for the public. <br />The only changes proposed are for the inclusion of the third phase and memorializing the private street and <br />utility items. <br /> <br />Preliminary Plat <br />City ordinance section 30-375 outlines the required findings for approval of a Preliminary Plat. <br /> <br />1. The proposed subdivision is consistent with the zoning regulations (article VI of this chapter) and <br />conforms in all respects with all requirements of this Code, including the zoning regulations and this article. <br />The property was rezoned to Planned Unit Development with the first phases of this subdivison. With the <br />PUD designation, the development will follow their own development standards, as approved in the ordinance <br />amendment for the PUD <br /> <br />2. The proposed subdivision is consistent with all applicable general and specialized city, county, and <br />regional plans, including, but not limited to, the city's comprehensive development plan. <br />As the property was rezoned to PUD and is guided for residential uses by the Comprehensive Plan, the <br />subdivision is consistent with all applicable plans. <br /> <br />3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, <br />susceptibility to erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and <br />density of development and uses contemplated. <br />The physical characteristics of the site are suitable for the type and density of development and uses <br />contemplated. <br /> <br />4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage <br />transportation, erosion control and all other services, facilities and improvements otherwise required in this <br />article. <br />The subdivision will include infrastructure to meet city requirements. The sanitary service and required lift <br />station will be privately owned and maintained, but will become public after making the connection to existing <br />services. The water service also requires reimbursement for previous work paid for by ERMU, but that now <br />serves the current development phase. Finally, additional permits required to comply with erosion control <br />standards are required and will be secured prior to building permit issuance. These concerns have been <br />included as conditions of approval. <br />Page 164 of 304
The URL can be used to link to this page
Your browser does not support the video tag.