Laserfiche WebLink
0$,10$,1 <br />3$5.,1*3$5.,1* <br /> <br />'5232))'5232)) <br />3/$=$3/$=$ <br />6725$*( <br />&$*(6&$*(6 <br />%$77,1*%$77,1* <br />&$*(6&$*(6 <br />6+(/7(56+(/7(5 <br />&29(5('67$',806($7,1*:,7+&29(5('67$',806($7,1*:,7+ <br />&21&(66,2169,(:,1*'(&.&21&(66,2169,(:,1*'(&. <br />$1'672506+(/7(5$1'672506+(/7(5 <br />'5232))'5232)) <br />3/$=$3/$=$ <br />(;3$1'('(;3$1'(' <br />321',1*321',1* <br />67250:$7(567250:$7(5 <br />321',1*321',1* <br />(;,67,1*(;,67,1* <br />321'321' <br />0,5$&/(0,5$&/( <br />),(/'),(/' <br />3/$<3/$< <br />*5281'*5281' <br />35(0,(535(0,(5 <br />),(/'),(/' <br />,17(50(',$7(,17(50(',$7( <br />),(/'),(/' <br /><287+<287+ <br />),(/'),(/' <br /><287+<287+ <br />),(/'),(/' <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶ <br />¶¶352&725$9(1:352&725$9(1:6&+22/671:6&+22/671: <br />3 5 2 &7 2 5 5 '1 : <br />352 <br />& <br />7 <br />2 <br />5 <br />5 <br />' <br />1 <br />: <br />¶¶ <br />¶¶ <br />(;,67,1*321'(;,67,1*321' <br />)8785( <br />3$5.,1* <br />67$//6 <br />29(5)/2:29(5)/2: <br />3$5.,1*3$5.,1* <br />67$//667$//6 <br />7766666766 <br />)8785)8785( <br />3$5.1*3$5.,1* <br />67$//67$//6 <br />¶¶¶¶ <br />6281':$//6281':$// <br />ELK RIVER PARKS & RECREATIONATHLETIC FIELDS FRAMEWORK PLANS <br />OAK KNOLL ATHLETIC COMPLEX <br />» Anticipates the removal/relocation of Ivan Sand <br />and the Education Technology Center <br />» Reconfi gures access to Proctor Road and School <br />Street, and creates a connection between the <br />two entries <br />» New, re-oriented full size (90’ basepath) <br />ballfi eld with grandstand seating <br />» Adds miracle fi eld and inclusive playground <br />» Plaza to support the premier fi eld, inclusive play <br />area, and miracle fi eld <br />» Creation of two dedicated youth (60’ basepath) <br />baseball fi elds with grass infi elds <br />» Creation of a dedicated intermediate (70-80’ <br />basepaths) baseball fi eld with grass infi eld <br />» Centralized, elevated plaza with shelter to <br />support the youth and intermediate fi eld <br />» New parking to support expanded ballfi eld <br />program <br />FINAL FIELD ALIGNMENT FINAL FIELD ALIGNMENT <br />TBD ON ELECTRIC LINESTBD ON ELECTRIC LINES <br /> » Sound wall to mitigate train noise <br />ELK RIVER PARKS & RECREATIONATHLETIC FIELDS FRAMEWORK PLAN <br />City of Elk River, Minnesota3 Page 102 of 117