Laserfiche WebLink
<br />the developer requests approval of a narrower public street at 29-feet. The request suggests that narrower <br />roads are naturally traffic calming and will create a safer neighborhood. City engineering staff desire all public <br />streets to comply with city standards. <br /> <br />City Utilities <br />All parcels will be served by city sewer and water. This will require the extension of existing trunk services, <br />which are the responsibility of the developer. Additional details regarding city services will be included in a <br />future preliminary plat application. <br /> <br />Housing Types <br />The proposal includes four different lot sizes, ranging in size from 50-foot-wide lots with a 35-foot-wide <br />building pad, up to 100-foot lots overlooking the Mississippi River. The majority of the parcels are between 65 <br />and 75-feet wide and are consistent with much of the development that has been approved in recent years. <br /> <br />The largest lots are located along the river and have a minimum lot size of 20,000 square feet. These <br />standards are a requirement of the Wild and Scenic River District for any parcel that abuts the river. Parcels <br />within the district, but not along the river, are required to be at least 75-feet wide with a minimum size of <br />10,000 square feet. Proposed setbacks for these lots are 30-feet for the front yard and require a minimum of <br />15-feet between buildings – generally consistent with the typical R-1c zoning district. <br /> <br />The majority of the lots, 284 in total, are 65-feet-wide. As noted earlier, this has been the most common <br />parcel size constructed in the city for a number of years. The proposed setbacks of 25-feet for the front yard <br />and 15 feet between buildings is also typical of these product types. <br /> <br />The smallest lot sizes are clustered closest to Highway 10 and are 50-feet-wide with a front yard setback of <br />25-feet and maintaining 15-feet between buildings. The lot size does create some concern for on-street <br />parking and placement of utilities. Parking has typically been a concern for smaller lots, and the developer is <br />proposing restricting driveway width to 16-feet to maximize curb space for parking. This leaves approximately <br />34-feet between driveways in the best-case scenario, which is typically not enough for two vehicles. Curves in <br />the roadway, fire hydrants, and mailboxes will further restrict the available on street parking. The applicant <br />has included a parking study evaluating the impacts of the smaller lots on available street parking. <br /> <br />City staff have concerns with the narrow lots and the impacts this will have on the project. The Planning <br />Commission should discuss the proposal and the impacts of the smallest lot sizes to the community. One <br />alternative may be to strategically mix the smaller lots throughout the area, so the density is not <br />concentrated, and street parking concerns are minimized. <br /> <br />Environmental <br />The site is located within the Wild and Scenic River District, which includes additional performance standards <br />and open space requirements. Generally, the standards require larger lots closer to the river, and a net open <br />space requirement for all areas within the district. The developer has been working closely with the DNR to <br />ensure the proposal satisfies the standards. <br /> <br />The attachments include additional information regarding compliance with the Wild and Scenic standards. <br />According to the exhibits, and conversations with the DNR, the project complies with the ordinance, and the <br />PUD will include additional performance standards to ensure long-term compliance. <br /> <br />Additionally, due to the development’s size and location, an Environmental Assessment Worksheet (EAW) is <br />required. An EAW is a state mandated analysis of the impacts a proposed development project may generate. <br />It includes a wide variety of topics, including traffic, historical elements, natural features, to name a few. The <br />applicant has submitted the EAW for initial review, and the city will follow the state mandated review process. <br />Ultimate approval of the EAW requires a review from the City Council. <br />Page 113 of 227