Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />Review Submittal Options <br />MnDOT’s goal is to complete reviews within 30 calendar days. Review materials received electronically <br />can be processed more rapidly. Do not submit files via a cloud service or SharePoint link. In order of <br />preference, review materials may be submitted as: <br /> <br />1. Email documents and plans in PDF format to metrodevreviews.dot@state.mn.us. Attachments <br />may not exceed 20 megabytes per email. Documents can be zipped as well. If multiple emails are <br />necessary, number each message. <br />2. For files over 20 megabytes, upload the PDF file(s) to MnDOT’s Web Transfer Client site: <br />https://mft.dot.state.mn.us. Contact MnDOT Planning development review staff using the same <br />email abovefor uploading instructions andsend an email listing the file name(s) after the <br />document(s) has/have been uploaded. <br /> <br />You are welcome to contact me at tod.sherman@state.mn.us with any questions. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Tod Sherman <br />Metro Planning Director <br /> <br /> <br />Copy sent via email: <br />Matt Barker, Director-Land Development, Brandi Kastner, Traffic Safety <br />Capstone Homes Katie Schmidt, CEO/Traffic Engineer, SSTS <br />Zach Carlton, Elk River Community LLC <br />Development Director Buck Craig, Permits <br />Luke Wehseler, Project Development, D3 Mike Kruse, Design <br />Mike Kowski, MaintenanceJim Henricksen, Modeling <br />Jason Swenson, Water Resources Suzy Scotty, Ped/BikePlanning <br />Forest Paulson, Right of Way Amrish Patel, Transit <br />Ashley Hansen, Traffic SafetyScott Shaffer, Planning <br />Natalie Ries, Noise Cameron Muhic, Planning <br />Mike Kronzer, Area Engineer/Coordinator Joe Widing, Metropolitan Council <br /> <br /> <br />Page 3 of 3 <br /> <br /> <br />