My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Adjustments Packet for February 25, 2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2020-2029
>
2025
>
Board of Adjustments Packet for February 25, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2025 2:54:33 PM
Creation date
2/21/2025 2:53:54 PM
Metadata
Fields
Template:
City Government
type
BASR
date
2/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1'-4"9'-3"31' <br />2'1'-4 1/2"8'9'-4 1/2"1'1'9'-9"22'32'29'-0" x 30'-0" <br />870 sq ft <br />Unexcavated Fill to Slab <br />Conc Curb Cut 3" Larger than Garage Doorfor (1) 2x4 Treated Header Bearing each sideOverhead <br />Gar Dr <br />Height <br />Garage <br />Wall <br />Height <br />* 2x6 Treated sill Plate set on Sill Sealer <br />* Anchor Bolts or Straps 12" from each corner <br />60" O.C. entire Perimeter <br />* 4" Poured Conc Floating Slab Foundation with <br />Thickened Perimeter Footing <br />4" Conc Slab <br />4" Class 5 Compacted Fill <br />(2) #4 Rebar <br />Thickened Slab Perimeter <br />12" Conc Footing <br />or Thickened <br />Slab for Post and <br />Beam Support <br />le Overhang <br />ve Overhang <br />h <br />Scale: 1/8"=1'-0" <br />Right-North-Hill ElevationLeft-South-Street Elevation <br />Rear-West Elevation <br />Scale 1/4"=1'-0" <br />Foundation Plan Page 2 <br />Craig & Kelly 1-13-25 <br />Page 11 of 14
The URL can be used to link to this page
Your browser does not support the video tag.