My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMU RES 02-11-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Resolutions
>
2025
>
ERMU RES 02-11-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 8:34:22 AM
Creation date
2/20/2025 8:34:22 AM
Metadata
Fields
Template:
City Government
type
ERMUR
date
2/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS <br /> Interconnection Process: In order to provide for coordinated interconnection of customer-owned <br /> distributed energy resources and comply with Minnesota Statutes Section 2166.1611,subd.3(2), <br /> Utility has adopted the"Minnesota Municipal Interconnection Process(M-MIP)2022"as recognized <br /> by the Minnesota Municipal Utilities Association Board of Directors at its February 9,2022, meeting <br /> and made publicly available at mmua.org. <br /> General technical requirements may be found in the Minnesota Technical Interconnection and <br /> Interoperability Requirements(TIIR)as adopted by the Minnesota Public Utilities Commission on <br /> January 22,2020 as part of DOCKET NO. E-999/CI-16-521. <br /> For utility-specific safety standards, required operating procedures for interconnected operations, <br /> and the functions to be performed by any control and protective apparatus, please contact Utility <br /> for its Technical Specifications Manual(TSM). <br />
The URL can be used to link to this page
Your browser does not support the video tag.