Laserfiche WebLink
<br /> <br /> <br /> <br />,., <br /> <br />ELK RI VER PARK BOARD <br />November 19, 1974 <br /> <br />Members Present: <br />Members Absent: <br /> <br />Gene Schuldt, Bob Westerlund. <br />Jim Bredick <br /> <br />Playground Equipment: Playground equipment has not been delivered yet. Lions <br />Club gave a check for the full $1,17S.00. Park Board mIl only pay for freight <br />charges. <br /> <br />Boat. Launching Site: Permit was obtained from Department of National Resources. <br />Work completed to date includes grading of the launching ramp. The rock base <br />has not been laid. Excess dirt from grading to be used!or top soil at the <br />Elk River Library. <br /> <br />Resurfacing of Baseball Diamonds: To date both infields have been graded. <br />Agricultural lime and sod has not been applied yet. <br /> <br />Orono Baseball Fence: Elk River-Jaycees are doing the -work. Old fence removed <br />and posts installed at new locations. Additional fencing posts, and top rails <br />are needed. Balance may not be completed due to cold weather and difficulty <br />in obtaining materials. <br /> <br />Orono Ball Field Lights: Lyle Collins has completed all of the work including <br />moving outfield posts and transfering infield lights to the higher poles. <br />Movement of outfield poles also included restringing the wire. <br /> <br />Beach/Police Resesitator: Equipment has been ordered, delivered, and paid <br />for. Budget allOived $425.00 for equipment actualcost.was $218.00, savings <br />on purchase was $207.00. Resesitator is now in custody of police department <br />until beach opens next spring. <br /> <br />Bills Approved <br />Gene Putnam $10.S4 <br />Larry Toth 5.92 <br />Donald Strei 3.25 <br />Gene Schuldt 9.17 <br /> <br />Next meeting Tuesday January 7, 1975 at 9:00 p.m. <br />