Laserfiche WebLink
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Thomas Geiser— Operations Director <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />February 11, 2025 <br />6.1e <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Working through the second round of maps for the new GIS mapping system that we <br />plan to move forward with in the future. Maps 1 through 60 are complete. <br />• Diversified inspected our line trucks during the week of January 20. <br />• ERMU has chosen Leidos Engineering for our third -party reviews on all pole <br />attachments. <br />• ERMU has chosen DGR Engineering for its 2025 Fault Current/Fuse Coordination Study. <br />• Tuesday, January 28 a vehicle struck a regulator bank along Highway 10, east of <br />Broadway Pizza, requiring crews to shut down the feeder for ten minutes. The accident <br />started a grass fire as well, picture below. <br />• On Sunday, January 26, ERMU had another Cooper/Eaton Switchgear failure. <br />• Ordering material for the 2025 construction season. <br />• Working with JonnyPops on their third service needs. <br />Page 1 of 1 <br />122 <br />