My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3a EMRUSR 02-11-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025
>
02-11-2025
>
2.3a EMRUSR 02-11-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2025 4:31:04 PM
Creation date
2/12/2025 10:37:06 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 — INTERCONNECTION PROCESS <br />Interconnection Process: In order to provide for coordinated interconnection of customer -owned <br />distributed energy resources and comply with Minnesota Statutes Section 21613.1611, subd. 3(2), <br />Utility has adopted the "Minnesota Municipal Interconnection Process (M-MIP) 2022" as recognized <br />by the Minnesota Municipal Utilities Association Board of Directors at its February 9, 2022, meeting <br />and made publicly available otm�l�a_^olg. <br />GeneroiteohniooirequirenoentanooybefoundintheMinneaotoleohniooi|nteroonneobonond <br />Interoperability Requirements (TIIR) as adopted by the Minnesota Public Utilities Commission on <br />January 22'2O2Ooapart ofDOCKET NO. E-SSS/C|-1S-521. <br />For utility -specific safety standards, required operating procedures for interconnected operations, <br />and the functions to be performed by any control and protective apparatus, please contact Utility <br />for its Technical Specifications Manual (TSM). <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.