Laserfiche WebLink
This scenario proposes splitting the local match equitably between partipicating partners according to the percent project cost in each jurisdiction 10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not. <br />Total Project Cost <br />Design/Engineering Cost <br />Soft Costs (eligible grant expense) <br />Local Match Total <br />Grant Request <br />Elk River Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />Grading (CY)20 60 $1,200.00 <br />Aggregate Base (CY)62 65 $4,030.00 <br />Paving (Ton)62 145 $8,990.00 <br />Signage, striping, and seeding (LS)1 780 $780.00 <br />$15,000.00 1 $0.00 Grant funded $0.00 $0.00 <br />Sherburne County Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />$0.00 0 $0.00 Grant funded $0.00 $0.00 <br />Zimmerman Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />$0.00 0 $0.00 Grant funded $0.00 $0.00 <br />Total Construction Expense $15,000.00 <br />Page 54 of 389