Laserfiche WebLink
Cost Participation, Feature 12 <br />Zimmerman Project Components Quantity Cost/Unit Total Cost <br />Percent Construction <br />Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />1/3 Mobilization 0.3333 35,000 $11,666.67 <br />Initial Grading/removal (SY)3500 25 $87,500.00 <br />Retaining Wall (SF)200 80 $16,000.00 <br />Paving (SY)3500 45 $157,500.00 <br />Grading, seeding (acre units)1 500 $500.00 <br />Trailhead Sign 1 35000 $35,000.00 <br />Portable Toilet Screen Fence (LF)1 6,500 $6,500.00 <br />Shade Structure 1 35,000 $35,000.00 <br />EV-Charging 1 19,000.00 $19,000.00 <br />E-Bike Charging 4 2,500.00 $10,000.00 <br />Water Filling Station 1 10,000.00 $10,000.00 <br />Picnic Tables 2 2,500.00 $5,000.00 <br />Waste Receptacles 2 500.00 $1,000.00 <br />LED Solar Lighting 3 15,000.00 $45,000.00 <br />Tree Planting 60 500.00 $30,000.00 <br />Native Planting (1-gallon pots)500 25.00 $12,500.00 <br />Bench 1 3,000.00 $3,000.00 <br />$485,166.67 0.663249032 $116,440.00Grant funded $97,033.33 $213,473.33Page 51 of 389