My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 07-15-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
07-15-2024 and Closed
>
4.4 SR 07-15-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 12:08:08 PM
Creation date
1/31/2025 12:08:08 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Participation, Features 1-4 <br />Elk River Project Components Quantity Cost/Unit Total Cost <br />Percent Construction <br />Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />1/3 Mobilization 0.3333 35,000 $11,666.67 <br />Trailhead Sign at 221st 1 35,000 $35,000.00 <br />Bike Repair Station 2 4,500 $9,000.00 <br />Portable Toilet Screen LF 1 6,500 $6,500.00 <br />Benches with concrete pad 3 3,000 $9,000.00 <br />ADA Width Limiter Gates 2 750 $1,500.00 <br />$72,666.67 0.099339257 $17,440.00Grant funded $14,533.33 $31,973.33 <br />Page 49 of 389
The URL can be used to link to this page
Your browser does not support the video tag.