Laserfiche WebLink
Head <br />of <br />Plant <br />Splitter <br />Structure <br />2025 thru 2029 <br />Capital Improvement Plan <br />Elk River, Minnesota <br />Project #WW-31 <br />Project Name Head of Plant Splitter Structure <br />Total Project Cost $1,500,000 Department Sewer Department <br />Type Improvement Category Utilities <br />Priority n/a Status Active <br />Useful Life 20 years <br />Description <br />Installation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions. <br />Justification <br />Currently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The addition of the splitter structure <br />will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive additional connections in the future (if NW or NW service <br />area expansions ever are considered). <br />Expenditures 2025 2026 2027 2028 2029 Total <br />Construction/Maintenance 0 1,500,000 0 0 0 1,500,000 <br />Total 0 1,500,000 0 0 0 1,500,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 Total <br />Sewer Fund 0 1,500,000 0 0 0 1,500,000 <br />Total 0 1,500,000 0 0 0 1,500,000 <br />Produced Using Plan-It CIP Software Page 48 / 59Page 107 of 211