My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 11-18-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
11-18-2024
>
10.1 SR 11-18-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 11:36:48 AM
Creation date
1/31/2025 11:36:48 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No.Item Description Quantity Unit Price Total1 <br />Mobilization LS1 80,000.00$ 80,000.00$ 2Clearing & Grubbing Acre2 2,650.00$ 5,300.00$ 38" PVC Gravity Sewer Main - Trenched LF 2,900 122.00$ 353,800.00$ 5Sanitary Manhole LF 150 298.00$ 44,700.00$ 6Sanitary Casting Assembly Each 10 950.00$ 9,500.00$ 7Exterior Chimney Seal Each 10 750.00$ 7,500.00$ 8Connect to Existing Gravity Sewer Each2 3,250.00$ 6,500.00$ 9Traffic Control LS1 8,000.00$ 8,000.00$ 10 Seeding Acre2 4,600.00$ 9,200.00$ 11 Seed Mixture LB 250 9.00$ 2,250.00$ 12 Fertilizer LB 750 6.00$ 4,500.00$ 13 Silt Fence LF 1,200 4.25$ 5,100.00$ 14 Erosion Control Blanket SY 800 4.50$ 3,600.00$ 15 Temporary Easement Costs LS1 15,000.00$ 15,000.00$ Construction Subtotal 554,950.00$ Contingencies 66,594.00$ Engineering 68,369.84$ Administration 24,861.76$ ESTIMATED PROJECT COST 714,775.60$ Page 142 of 204
The URL can be used to link to this page
Your browser does not support the video tag.