My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 SR 11-18-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
11-18-2024
>
8.1 SR 11-18-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 11:36:18 AM
Creation date
1/31/2025 11:36:18 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/18/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Elk River <br />Northeast Development Area Optimization Proposal <br />Page 7 of 8 <br /> <br /> <br />9. ERMU will provide historical water demand data (up to 5 years) for the existing water <br />distribution system for each pressure zone. <br />10. Water distribution system model will be updated using WaterGems. Modeling scenarios <br />will be limited to steady-state only. <br />11. The scope and fee does not include identifying permit requirements for stormwater, <br />erosion control, DNR, MPCA, MDH, etc. <br /> <br />Schedule <br /> <br />We anticipate that full project delivery will be completed within the schedule depicted in the table <br />below. The virtual check-in meetings are to be scheduled during the model setup and alternative <br />development period. The project summary meeting is anticipated to be held upon delivery of the <br />cost estimate and draft engineering report. The final in-person presentation of the findings and <br />recommendations to the City Council will be scheduled upon delivery of the final report. <br /> <br />Task Description Duration(1) <br />Model Setup and Alternative Development 4 months <br />Cost Estimate & Draft Report 1 month <br />Final Report 1 month <br />(1) Most of the data requested within this proposal is required to develop the <br />new sanitary sewer model, which is the first task of this project. Therefore, <br />task durations may be impacted should data not be readily available at the <br />beginning of the study. <br /> <br />Fee Proposal Estimate <br /> <br />AE2S will complete the proposed scope of services outlined above for an hourly, not-to-exceed, <br />fee of $89,800. The table below depicts the anticipated fee estimate to complete each task based <br />on our 2024 hourly rate schedule. A detailed fee table is provided as an attachment to this <br />proposal. Professional fees and expenses are based on the understanding presented within this <br />letter. <br /> <br />Task <br />Number Task Description Fee <br />Estimate <br />1 Project Management & Communication $12,985 <br />2 Sanitary Sewer System Analysis $38,719 <br />3 Water Distribution System Analysis $13,715 <br />4 Opinion of Probable Project Cost $6,558 <br />5 Feasibility Study Report Preparation $17,823 <br />Total Hourly Not-to-Exceed Fee $89,800 <br />Page 106 of 204
The URL can be used to link to this page
Your browser does not support the video tag.