My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g EMRUSR 12-10-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
12-10-2024
>
6.1g EMRUSR 12-10-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 1:02:17 PM
Creation date
12/10/2024 12:57:52 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mike Tietz—Technical Services Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />December 10, 2024 <br />6.1g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />In November, locators processed 319 locate tickets. These consisted of 247 normal <br />tickets, 4 emergency tickets, 43 updated tickets, 8 cancellations, 10 meets, 2 boundary <br />surveys, 2 corrections, and 3 non -excavations. This resulted in a 37.0% decrease in <br />tickets from the previous month and a 24.8% decrease from the prior November. <br />• Electrical technicians completed 271 service order tasks, updated the power bill, <br />addressed customer meter issues and any off-peak concerns. <br />• The Advanced Metering Infrastructure (AMI) residential water meters and residential <br />electric meters continue to be installed in new services. The electrical technicians have <br />been busy changing out meters around the system and recently completed the meter <br />installations at several different apartment buildings. Approximately 3,600 water meters <br />and 3,400 electric meters are currently active within our AMI system. <br />• Staff has been working on programming regulator controls for an upcoming 2025 <br />replacement project at our North substation. We will be replacing all five recloser tanks <br />and controllers. Staff has also been working on programming capacitor bank controllers <br />as part of our replacement project that we anticipate will start in mid -December. <br />We are finalizing the control building and relay panel orders for the East substation. The <br />expected delivery of the building will be between the fall of 2025 and spring of 2026. <br />The panel is expected to arrive in the summer of 2025. <br />• Our monthly peak was 43.50 MW on November 26 at 5:44pm. <br />Page 1 of 1 <br />150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.