My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2z2 EMRUSR 12-10-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
12-10-2024
>
5.2z2 EMRUSR 12-10-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 1:02:03 PM
Creation date
12/10/2024 12:50:34 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br />Energy Management Program Rates <br />ERMU shall provide: <br />1. All electric energy consumed by the ETS water heater at $0.0501 per kWh. <br />2. This equipment will be energized only for 8 off-peak hours daily. <br />3. A meter to measure electricity consumed by the ETS water heater. <br />4. A load control device and meter socket to accommodate the off-peak meter. <br />Rate is subject to application of Power Cost Adjustment (PCA). <br />Federal, state, and local taxes may apply. <br />Adopted PesembeF 12, 2s=4December 10, 2024 <br />Effective January 1, 29242025 <br />Page 3 of 3 <br />125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.