My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 EDSR 06-17-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2021-2029
>
2024
>
06-17-2024
>
7.2 EDSR 06-17-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 9:20:03 AM
Creation date
11/25/2024 9:20:03 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Proposal 1:Concept/Design “Where Energy Flows”mosaic for FT Center <br />examples of parallelogram-style mosaic (The Light Of A New Day On The South Dakota Plains <br />commissioned by 1%for the Arts City of Brookings,SD Government Center (left)inspiration <br />photograph (center)detail of parallelogram-style mosaic (right) <br />sample inspiration image from riverbank in Elk River (left) <br />digital mock-ups of parallelogram-style mosaic on either wall section at FT Center (center and right)- <br />actual mosaic would have similar color scheme but inspired by views in Elk River.Proposed mosaic <br />would introduce color and subtle reflected light into the space.The parallelogram-style motif also <br />gives the illusion of movement and energy waves. <br />Page 100 of 104
The URL can be used to link to this page
Your browser does not support the video tag.