My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.3 SR 11-04-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
11-04-2024
>
11.3 SR 11-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 8:47:51 AM
Creation date
11/25/2024 8:47:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 thru 2029 <br />Capital Improvement Plan <br />Elk River, Minnesota <br />Project � FD-25 <br />Project Name Fire Equipment <br />Department Fire Type Equipment <br />Category Equipment Priority n!a <br />Status Active Useful Life 10 years <br />Description <br />Extrication tools (.taws of Life) - update two sets on front line apparatus. The purchase would include a spreader, cutter, and ram device along with necessary batteries, <br />chargers, and modification to apparatus to propertly secure them. ($54,000) Moveable wall maze system for training area in station 3. ($45,000) <br />Justification <br />We have two sets of extrication tools that are 10+ years old on front line fire engines. In 2021 the department evaluated battery operated tools and purchased one set foe the <br />rescue truck. These tools have been highly successful and proved their value in allowing quick deployment and reduced maintenance. Maze system was not included in <br />station 3 construction due to lack of funds. <br />Expenditures 2025 2026 2027 2028 2029 Total <br />Equipment 109,000 0 0 0 0 109,000 <br />Total 100,000 0 0 0 0 10b,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 Total <br />Yet To Be Determined <br />109,000 0 <br />Total 109,000 0 <br />0 0 <br />0 0 <br />0 <br />0 <br />10%000 <br />109,000 <br />Produced Using Plan -It CIP Software ��o 1 2f1,�6 <br />Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.