Laserfiche WebLink
2025 thru 2029 <br />Capital Improvement Plan <br />Elk River, Minnesota <br />Project � FD-25 <br />Project Name Fire Equipment <br />Department Fire Type Equipment <br />Category Equipment Priority n!a <br />Status Active Useful Life 10 years <br />Description <br />Extrication tools (.taws of Life) - update two sets on front line apparatus. The purchase would include a spreader, cutter, and ram device along with necessary batteries, <br />chargers, and modification to apparatus to propertly secure them. ($54,000) Moveable wall maze system for training area in station 3. ($45,000) <br />Justification <br />We have two sets of extrication tools that are 10+ years old on front line fire engines. In 2021 the department evaluated battery operated tools and purchased one set foe the <br />rescue truck. These tools have been highly successful and proved their value in allowing quick deployment and reduced maintenance. Maze system was not included in <br />station 3 construction due to lack of funds. <br />Expenditures 2025 2026 2027 2028 2029 Total <br />Equipment 109,000 0 0 0 0 109,000 <br />Total 100,000 0 0 0 0 10b,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 Total <br />Yet To Be Determined <br />109,000 0 <br />Total 109,000 0 <br />0 0 <br />0 0 <br />0 <br />0 <br />10%000 <br />109,000 <br />Produced Using Plan -It CIP Software ��o 1 2f1,�6 <br />Page <br />