Laserfiche WebLink
Ci: 24-14 Narrative <br />Project Scope & Description: <br />This project is Phase 02 of a mialti-phased master plan. Phase 02 includes a new addition on the north side of <br />the existing building as well as the Site work that is associated for the future additions. <br />The Master Plamning of this project awns to construct new additions to the current building, addressing the <br />church's growth needs in three distinct areas: <br />o A new dedicated multipurpose space for clnildren's actixities, allowing for the existing space to be <br />utilized for additional classrooms. <br />o A new space tailored to the growing attendance of youth. <br />o A new, worship center, lobby, and administrative space to serve the entire congregation. <br />This expansion aligns with the Elk River Comprehensive Plan, wh ich designates this area as one of targeted <br />and projected growth areas for the city-. The Future Land Use flap indicates a projection of new traditional <br />single-family homes within just a few miles of the church location. <br />The design of the expansion is designed to complement the existing chtrch's aesthetics while utilizing <br />materials that are efficient, low -maintenance, and durable. The proposed exterior «ill feature load bearing <br />CMMLT, precast concrete panels, and standing seam metal siding <br />The current parking spaces count is 287 parking spaces, with a future proposed location for an additional 34 <br />spaces. <br />Number of Employees & Hours of Operation: <br />River of Life church currently has 13 employees. The hours vary depending on the season, but below is the <br />tpical hours of operation: <br />o Sunday = 9am-12pm (Church Senices) <br />o Monday = 9am-2pm Office Staff} <br />Fall = 9am-4pm <br />o Tuesday = 9am-2pm Officer Staff) <br />Fall = 9am-4pm <br />o Wednesday = 9am-2pm (Office r Staff <br />Fall = 9am-4pm <br />a Thursday- = 9am-2pm Office r Staft <br />Fall = 9am-4pm <br />o Friday = Closed <br />o Saturday = Closed <br />Siviag_e: <br />There are two proposed signs for the project, one on the Northeast side of the building and one on the <br />Southwest side. The current design of this signage is for this to be lettering, Illuminated from below or back- <br />lit. Current sign design dimensions are --23' W x 4' H. <br />Page 102 of 381 <br />