Laserfiche WebLink
Construction <br />Services, Inc. Building Value with Integrity <br />• There is an existing 8" DIP stub in the southwest corner of this property. Water service to this building <br />should be connected to the existing stub or it needs to be abandoned at the main. <br />• Acknowledged. Sewer and water connections likely to be revised to locations that will not disturb Twin Lakes <br />Road. <br />STAFF REPORT / REQUEST FOR ACTION <br />1. A cross -access easement shall be prepared and recorded outlining the use and maintenance <br />obligations of the access onto Quincy Street. <br />• No longer applicable (revised Site Plan removes connection to Quincy Street). <br />2. All comments on the Comment Letter dated August 2 I, 2024, shall be addressed. <br />• See previous responses. <br />3. Staff approval of all site, civil, and development plans. <br />• Acknowledged. <br />4. The property shall be platted prior to issuance of any building permit. <br />• Simple Plat Application submitted to City on 8/26/24. Departmental reviews underway; DigniSuites to <br />adopt review requirements upon mutual agreement. <br />Brian Winges and I met with the residents of Pullman Place on September 3 to provide more information on our <br />plans, and to achieve a better understanding of their concerns about the project. As they stated in the Planning <br />Commission Public Hearing, the impact of potential traffic pattern changes remains high on their list, but once again, <br />they seem to be pleased with the overall design, and feel we'll be a positive addition to the community. We <br />understand they've requested a meeting with the City to address the traffic issue, and we'd be happy to participate <br />in the discussion. <br />Our team appreciates the city process thus far, and we look forward to our next appearance at the City Council <br />Public Hearing on September 16. Please let me know if you need any additional information prior to that meeting. <br />Best Regards, <br />CBS CONSTRUCTION SERVICES, INC. <br />Scott Clements <br />Sr. Project Manager <br />Cc: Zack Carlton <br />Jennifer Green <br />Team DigniSuites <br />11124 Zealand Avenue No. • Champlin, MN55316 • 763-569-4020 • Fax 769-569-4117 • www cbsconstruct.com <br />Page 91 of 381 <br />