Laserfiche WebLink
Owner. City of Elk Rlver Owners Project No.: <br />Engl.... Bolton & Menk, Inc. Engineer's Project No.: 0R1.128082 <br />Conmactor. North Valley Inc Cenlractois Project Ne.: <br />Project: 2023 Street Improvements Project Agency's Project N.,: <br />IAPPli-ion No.: 8 Applicatlen Period: From 11/17/23 to 06/07/24 Applicatl4n Date: 06/07/24 <br />BW item <br />No, <br />Contract <br />lnfermatbn <br />Previous <br />Estimate <br />Work Completed <br />Materials Currently Stored <br />(notI <br />($) <br />�War,Completed <br />and Materla6 <br />Steredto Date <br />(H+I) <br />$ <br />%ef <br />Value of <br />Item <br />(1/F) <br />(%) <br />Item Quantity <br />Units <br />Unit Prke <br />($) <br />Value of Bid Item <br />(C 1l E) <br />$) <br />Quantity Previous <br />Estimate <br />Value Previous <br />Estimate <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />Value of Wed' <br />[ompletedto Date <br />(EXG) <br />($) <br />Chan .Orders <br />COL <br />WATSON CIRCLE PATCH <br />1.0. <br />LUMP SUM <br />9,493.45 <br />8,483.45 <br />1,00 <br />8,483.45 <br />1.00 <br />9,483.45 <br />8,483.45 <br />100% <br />CQw2.1 <br />REMOVE 12" STORM PIPE <br />271.00 <br />LIN FT <br />23A0 <br />6,233.00 <br />271.00 <br />6,233.00 <br />271.00 <br />6,233.00 <br />6,233.00 <br />100% <br />CO-2.2 <br />16" RCP STORM PIPE <br />271.00 <br />LIN FT <br />96.00 <br />26:0160M <br />271.00 <br />26,016.00 <br />271.00 <br />26,016.00 <br />26,016.00 <br />300% <br />CO-2.3 <br />CONNECTTO EXMH <br />2.00 <br />EACH <br />4,025.00 <br />8,050.f10 <br />2.00 <br />800504DO <br />2.00 <br />8,050.00 <br />8,050.00 <br />100% <br />CO-2.4 <br />BITUMINOUS STREET PATCH <br />400.00 <br />SO YO <br />31.33 <br />12,532.00 <br />400.00 <br />12,532, DO <br />400.00 <br />12,532.00 <br />12,532.00 <br />100% <br />CO-2.5 <br />REMOVE & REPLACE CURB & GUTTER <br />20.00 <br />LIN FT <br />35.13 <br />]02.60 <br />CO-1.6 <br />MOBILIZATION <br />LOD <br />LUMP SUM <br />9,125.D0 <br />9,125.00 <br />1.00 <br />9,125.00 <br />1.00 <br />9,125.00 <br />9,125.00 <br />300% <br />CO-2.7 <br />TRAFFIC CONTROL <br />1.00 <br />LUMP SUM <br />450.00 <br />450.00 <br />1.00 <br />450.00 <br />1.00 <br />450.00 <br />45000 <br />300% <br />C0g2.8 <br />GRATED CASTING LID <br />1.00 <br />EACH <br />397.35 <br />397.35 <br />1.00 <br />397.35 <br />1.00 <br />39].35 <br />397.35 <br />Ion <br />CO-2.9 <br />CLEAR & GRUB TREE <br />4.00 <br />EACH <br />675.00 <br />2,700.00 <br />4.00 <br />2,700.00 <br />4.00 <br />2,700.00 <br />2,700.00 <br />100% <br />CO-2.10 <br />R-3501-TB CASTING ASSEMBLY <br />2.00 <br />1 EACH <br />512.00 <br />1 1,024.00 <br />2.00 <br />1,024.00 <br />1 2.W <br />1,024.00 <br />1 <br />1.024.00 <br />lon <br />CO-3.1 <br />MOBILIZATION <br />1.00 <br />LUMP SUM <br />25,050.99 <br />25,050.99 <br />0.75 <br />16,788.24 <br />18,788424 <br />75% <br />CO-3.2 <br />REMOVE CONCRETE CURB & GUTTER <br />239.00 <br />LIN FT <br />20.58 <br />4,918.62 <br />107.00 <br />2,202.06 <br />2,202.05 <br />45% <br />CO-3.3 <br />REMOVE WUMINOUS PAVEMENT <br />3,11 <br />SQYD <br />4.03 <br />14,564.42 <br />3,440.97 <br />13,898.95 <br />131898.95 <br />95% <br />CO-3.9 <br />REMOVE CONCRETE PAVEMENT <br />435.DO <br />SO FT <br />4.11 <br />1,787.85 <br />194.00 <br />797.34 <br />797.34 <br />45% <br />CO-3.5 <br />SALVAGE & REINSTALL LANDSCAPING WALL <br />15.00 <br />LF <br />43.91 <br />657.15 <br />15.00 <br />657.15 <br />657.15 <br />100% <br />CO-3.6 <br />COMMON EXCAVATION(DV)(P) <br />799.DO <br />CU YD <br />34.1E <br />27,309.82 <br />799.00 <br />27,30482 <br />27,309.82 <br />200% <br />CO-3.7 <br />AGGREGATEBASECES55 <br />776.00 <br />CU YD <br />58.31 <br />45,141411 <br />B43.5] <br />49,188.57 <br />49.199.57 <br />10933 <br />CO-3.8 <br />BITUMINOUS PATCH SPECIAL(DRIVEWAY/TRAIL <br />3,981.00 <br />SQYO <br />17.06 <br />67,915.86 <br />3,536.25 <br />60,328.43 <br />60,328A3 <br />89% <br />CO-3.9 <br />MILL BITUMINOUS SURFACE (1.5"1 <br />2,082.00 <br />SQYO <br />6.29 <br />13,095.78 <br />222.70 <br />1,400.78 <br />1,400.78 <br />11% <br />CO-3.10 <br />TYPE SP 9.5 WEARING COURSE MIXTURE(2,C) <br />175.W <br />TON <br />133.35 <br />23,336425 <br />63.13 <br />8,418.39 <br />8,418.39 <br />3656 <br />CO-3.11 <br />6" PVC PIPE DRAIN <br />55.00 <br />LF <br />L 40.53 <br />2,229.15 <br />55.00 <br />2,229.15 <br />2,229.15 <br />1 100% <br />CO-3.12 <br />ADIUST CASTING (MANHOLE) <br />2.00 <br />EACH <br />1,204.80 <br />2,409.68 <br />CO-3.13 <br />ADIUSTENING(CATCHBASIN) <br />1.00 <br />EACH <br />711.95 <br />711.95 <br />[0-3.34 <br />4"CDN[RETE WALK <br />135.00 <br />SQ ET <br />16.43 <br />2,218.05 <br />964W <br />1,577.28 <br />1,577.28 <br />51% <br />CO-3.15 <br />6"CONCRETE WALK <br />300.00 <br />SQFT <br />27.39 <br />8,21AO0 <br />98.00 <br />2,683.24 <br />2,683.24 <br />33% <br />CO-3.16 <br />CONCRETE CURB& GUTTER DESIGN 11618 <br />239.00 <br />LIN FT <br />38.34 <br />9,153.26 <br />107.00 <br />4,102.38 <br />4,102.38 <br />45% <br />CO-3.17 <br />TRUNCATED DOMES <br />40,00 <br />SQ FT <br />54.77 <br />2,190.80 <br />8.00 <br />439.16 <br />438.16 <br />20% <br />CO-3.18 <br />TRAFFIC CONTROL <br />1.DO <br />LUMPSUM <br />2,628.73 <br />2,62B.73 <br />1.00 <br />2,620.73 <br />2.628.73 <br />300% <br />CO-3.19 <br />COMMON TOPSOIL BORROW(LVf <br />205.W <br />CU YO <br />58.05 <br />11,900.25 <br />64.00 <br />3,715.20 <br />3,715.20 <br />31% <br />CO-3.20 <br />FERTILIZER TYPE <br />375.00 <br />POUND <br />1.30 <br />227.50 <br />CO-3.21 ISEEDING <br />0.50 <br />ACRE <br />328.60 <br />164.30 <br />CO3.22 <br />SEED MIXTURE 25-151 <br />150.00 <br />POUND <br />9.85 <br />1,477.50 <br />CO-3.23 <br />HYDRAULIC BONDED FIBER MATRIX <br />1.750.00 <br />POUND <br />1.85 <br />1,23].511 <br />CC,3.74 <br />4"SOLID LINE MULTI-COMPONENT(WHITE) <br />655.00 <br />LIN FT <br />3.94 <br />21580.70 <br />30.00 <br />118.20 <br />118.20 <br />5% <br />CO3.25 <br />PAVEMENT MARKING SPECIAL <br />9.00 <br />SF <br />26.29 <br />236.61 <br />4,50 <br />118.31 <br />118.31 <br />50% <br />C0-3.26 <br />SANITARY SEWER SERVICE REPAIR <br />1.00 <br />JEACH <br />7,393.20 <br />7,393.20 <br />1.00 <br />7,393.20 <br />7,393.20 <br />300% <br />CO-3.27 <br />ALTS- SITE 3 OVERNYTRAIL 2.5" <br />"am <br />SY <br />24.77 <br />111889.60 <br />CO-3.29 <br />ALT1-SITE3REMOVE-REPLACETRAILW/CLS&BIT <br />480.00 <br />ISY <br />37.88 <br />UE192AD <br />Change Order Totals <br />$ 386,653.88 <br />$ 75,010.1110 <br />$ 2831W4.38 <br />$ <br />$ 283,004.38 <br />73% <br />r Original Contract and Change Orders <br />Pro)ecl Totals $ 5920012.59 1 1 <br />$ 52102]918 5 5418272 ]6 S 5 Rl1g <br />E)CDC C-620 Ctni r.-'s Applicatlon for Payment <br />Unit Price (c) 2018 National Society of Professional Engineers far UCDC. All rights reserved. 3 of 3 <br />Page 38 of 372 <br />