My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5 SR 05-20-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
05-20-2024
>
7.5 SR 05-20-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:13:57 PM
Creation date
11/15/2024 1:13:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONAL USE PERMIT APPLICATION <br />Application Requirements <br />Each of following applicable requirements (unless waived by staff) shall be submitted: <br />❑Application Fee <br />❑Full legal description of the subject property in an editable Word format <br />• See attached narrative <br />❑A typewritten narrative (see Description of Project Narrative) <br />• See attached narrative <br />❑ Site, Utility, Grading/Drainage Plan <br />• At time of design and permitting these will be addressed. <br />❑Landscape Plan completed by registered landscape architect <br />• At time of design and permitting these will be addressed. <br />❑Drainage Calculations o The grading/drainage plan must be reflective of the final plan, including any <br />revisions required by the Technical Evaluation Panel, if appropriate. <br />• At time of design and permitting these will be addressed. <br />❑Building Elevations, including one (1) color rendering o For townhome projects, calculations of material by <br />elevation must be included. <br />• Provided for only current proposed building addition. <br />❑Floor Plans <br />• Provided for only current proposed building addition. <br />❑ Wetland Delineation (if wetlands are present) <br />• Does not apply <br />❑ Wetland Mitigation Plan (if wetlands are impacted) o The wetland delineation and mitigation must be <br />reviewed by the Technical Evaluation Panel and revisions made prior to review by the Planning Commission. <br />• Does not apply <br />❑EAW/EIS Requirements o The EAW/EIS process must be in concert with any application process. The <br />Planning Commission must comment on an EAW/EIS along with an application. <br />• At time of design and permitting, these will be addressed. <br />Page 3 of 5 <br />Page 250 of 430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.