Laserfiche WebLink
FINAL PAYMENT <br />CITY OF ELK RIVER <br />NATURES EDGE BUSINESS CENTER THIRD ADDITION <br />Base Bid <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$ 70,400.00 <br />$ 70,400.00 <br />1 <br />$ 70.400.00 <br />2 <br />CLEARING <br />10 <br />EACH <br />S 112.80 <br />$ 1128.00 <br />10 <br />$ 1,128.00 <br />3 <br />GRUBBING <br />10 <br />EACH <br />$ 75.20 <br />S 752.00 <br />10 <br />$ 752.00 <br />4 <br />CLEARING <br />2.15 <br />ACRE <br />$ 7.200.00 <br />$ 16,480.00 <br />2.15 <br />$ 15,480.00 <br />5 <br />GRUBBING <br />2.15 <br />ACRE <br />$ 4.800.00 <br />S 10.320.00 <br />2.15 <br />$ 10.320.00 <br />6 <br />REMOVE CONCRETE APRON _ <br />1 <br />EACH <br />$ 300.00 <br />$ 300.00 <br />1 <br />$ 300.00 <br />7 <br />REMOVE GATE VALVE AND BOX <br />1 <br />EACH <br />$ 400.00 <br />5 400.00 <br />1 <br />$ 400.00 <br />8 <br />REMOVE HYDRANT <br />1 <br />EACH <br />$ 400.00 <br />$ 400.00 <br />_ <br />1 <br />$ 400.00 <br />9 <br />REMOVE SIGN <br />1 <br />EACH <br />$ 50.00 <br />S 50.00 <br />1 <br />$ 50.00 <br />10 <br />SALVAGE SIGN <br />2 <br />EACH <br />$ 60.00 <br />$ 100.00 <br />2 <br />$ 100.00 <br />11 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH} <br />590 <br />LIN FT <br />$ 3.50 <br />$ 2,065.00 <br />670 <br />$ 2,346.00 <br />12 <br />REMOVE WATERMAIN <br />10 <br />LIN FT <br />$ 90.00 <br />$ 900.00 <br />10 <br />$ 900.00 <br />13 <br />REMOVE CONCRETE CURB <br />797 <br />LIN FT <br />$ 3.50 <br />S 2,789.50 <br />798 <br />$ 2.793.00 <br />14 <br />REMOVE BITUMINOUS PAVEMENT <br />_ 1,374 <br />SO YD <br />S 5.00 <br />$ 6.870.00 <br />1,374 <br />$ 6.870.00 <br />15 <br />EXCAVATION - COMMON <br />95,211 <br />CU YD <br />$ 1.96 <br />$ 186,613.56 <br />95,211 <br />$ 186,613.56 <br />16 <br />DEWATERING <br />1 <br />LUMP SUM <br />$ 44,000.00 <br />$ 44.000.00 <br />1 <br />$ 44.000.00 <br />17 <br />SUBGRADE SOIL MODIFICATION <br />10,471 <br />SO YD <br />$ 0.75 <br />$ 7,853,25 <br />1D,471 IS <br />7,853.25 <br />18 <br />SUBGRADE PREPARATION <br />28.9 <br />ROAD STA <br />$ 600.00 <br />$ 17,340.00 <br />28.9 <br />$ 17.340.00 <br />19 <br />AGGREGATE BASE CLASS 5 - TRAIL (CV) P <br />495 <br />CU YD <br />$ 35,60 <br />$ 17,622.00 <br />495 <br />$ 17.622.00 <br />20 <br />AGGREGATE BASE CLASS 5 - STREET 1CVy P <br />3.088 <br />CU YD <br />$ 27.00 <br />$ $3,376.00 <br />3,088 <br />$ 83,376.00 <br />21 <br />MILL BITUMINOUS SURFACE 20) <br />124 <br />SO YD <br />$ 20.00 <br />$ 2.480.00 <br />100 <br />$ 2,000.00 <br />22 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />705 <br />GALLONS <br />$ 3.00 <br />$ 2,115.00 <br />685 <br />$ 2.055.00 <br />23 <br />TYPE SP 12.5 WEARING COURSE MIXTURE 2,B) 2.5" THICK <br />2,686 <br />SO YD <br />$ 13.70 <br />$ 36,798.20 <br />2,686 <br />$ 36,798.20 <br />24 <br />TYPE SP 12.5 WEARING COURSE MIXTURE 3,B 2.0" THICK <br />10,072 <br />SO YD <br />$ 6.65 <br />S 87.122.80 <br />10.072 <br />S 87.122.80 <br />25 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE 3,Bl 2.5' THICK <br />9,948 <br />SO YD <br />$ 10.30 <br />$ 102,464AD <br />9.948 <br />$ 102,464.40 <br />26 <br />15" RC PIPE APRON <br />3 <br />EACH <br />$ 1,040.00 <br />$ 3,120.00 <br />3 <br />$ 3.120.00 <br />27 <br />18" RC PIPE APRON <br />2 <br />1 <br />EACH <br />EACH <br />$ 1,102.00 <br />$ 1.257.00 <br />$ 2.204.00 <br />$ 1,257.00 <br />2 <br />1 <br />$ 2.204.00 <br />$ 1,257.00 <br />28 <br />21" RC PIPE APRON <br />29 <br />42" RC PIPE APRON <br />1 <br />EACH <br />S 2,682.00 <br />$ 2,682.00 <br />1 <br />$ 2,682.00 <br />30 <br />TRASH GUARD FOR 15" PIPE APRON <br />3 <br />EACH <br />$ 556.00 <br />$ 1,668.00 <br />3 <br />$ 1,668.00 <br />31 <br />TRASH GUARD FOR 18" PIPE APRON <br />2 <br />EACH <br />5 610.00 <br />$ 1,220.00 <br />2 <br />$ 1,220.00 <br />Page 1 ER308-P2y Estm ie <br />Page 63 of 201 <br />