Laserfiche WebLink
Request for Action <br />ver <br />To <br />Item Number <br />Planning Commission <br />5.3 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />February 27, 2024 <br />Zack Carlton, Community Development Director <br />Item Description <br />Reviewed by <br />Vireo Health — Mark Doherty, 10700 1651h Ave NW <br />Chris Leeseber , Senior Planner <br />■ Conditional Use Permit to Allow a Commercial <br />Reviewed by <br />Cannabis Cultivation Facility, Case No. CU 24-03 <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit with <br />the following conditions to satisfy the standards set forth in Section 30- <br />654: <br />1. The facility must comply with all licensing and operating j <br />procedures required under Minnesota Statutes Chapter 342., <br />2. The Conditional Use Permit may be issued prior to the cR 33 <br />applicant having received all necessary state permits and <br />licenses, but the applicant shall submit proof of obtaining all <br />state permits prior beginning cultivation operations. <br />r <br />3. Issuance of this CUP does not exempt the applicant from all I _Rk - 1, <br />standards outlined in state statute. <br />4. The operation/building must connect to city sewer and water - Hwy to°, y <br />and pay the required SAC/WAC fees in accordance with city _ , _ cR iz_ . <br />codes._ �Y <br />X <br />5. Construction activities will require signed plans prepared by a <br />qualified professional. r. <br />Background/Discussion y • <br />The property is zoned I1 (Light Industrial) where Commercial 6y <br />Cannabis Cultivation facilities require a Conditional Use Permit (CUP). <br />This use was added to the city ordinances earlier this year and during Figure I <br />the ordinance review, the city has generally considered the use to be <br />similar to a light manufacturing operation. <br />Vireo Health will utilize approximately 75,800 SF of the former GRE facility at 10700 1651h Ave NW. The site has <br />largely been operated as a storage facility since GRE ceased operations on the property. The equipment used by <br />GRE has been removed and the building is mostly vacant. The applicant will occupy a majority of the building, <br />which will require additional renovation and modifications. The entire site will also have onsite security and 24/7 <br />surveillance. <br />The proposal includes 8,000 SF of office space, 10,000 SF of storage and processing space, and 58,000 SF of <br />sealed cultivation rooms. Each cultivation room will have a positive pressure HVAC system to minimize cannabis <br />The Elk River Vision <br />A avelcoming community n ith revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and insires prosperity. <br />rPI1EIEI AY <br />NATURE <br />Updated.• January 2023 <br />Page 99 of 229 <br />