My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.01g EMRUSR 11-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
11-12-2024
>
6.01g EMRUSR 11-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2024 1:40:54 PM
Creation date
11/8/2024 1:37:30 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Mike Tietz—Technical Services Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />November 12, 2024 <br />6.01g <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />In October, locators processed 506 locate tickets. These consisted of 400 normal tickets, <br />2 emergency tickets, 66 updated tickets, 15 cancellations, 8 meets, 2 boundary surveys, <br />10 corrections, and 3 non -excavations. This resulted in a 7.0% decrease in tickets from <br />the previous month and a 9.1% increase from the prior October. <br />• Electrical technicians completed 164 service order tasks, updated the power bill, <br />addressed customer meter issues and any off-peak concerns. <br />• The Advanced Metering Infrastructure (AMI) residential water meters and residential <br />electric meters continue to be installed in new services. The electrical technicians have <br />been busy changing out the current Automated Meter Reading meters for AMI around <br />the system and recently completed the meter installations at several different <br />apartment buildings. Approximately 2,500 water meters and 1,600 electric meters are <br />currently active within our AMI system. <br />• For the month of October, staff did not run generators at the power plant. <br />• Staff completed rough grade at the East substation site. Staff also completed the <br />replacement of the Load Tap Changer position sensor at the North substation. <br />• Jeff Murray and I attended the Xylem Reach Conference in Atlanta, GA, October 13-16. <br />There was a lot of knowledge gained from the conference sessions and opportunities to <br />network with our peers from across the country. We truly appreciate the opportunity to <br />attend this conference and would appreciate being able to attend again in the future. <br />• Our monthly peak was 46.49 MW on October 1 at 3:41 p.m. <br />Page 1 of 1 <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.