My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2024 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2020 - 2029
>
2024
>
05-28-2024 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 4:17:57 PM
Creation date
9/24/2024 4:17:55 PM
Metadata
Fields
Template:
City Government
type
PCM
date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Planning Commission Minutes <br />May 28, 2024 <br />--------- <br />Page 4 of 8 <br />Commissioner Booth asked if the applicant was using the building as part of the total storage amount. <br /> <br />Mr. Leeseberg stated the applicant is using 6700 sq. ft. of the building for storage and 20,000 sq. ft. of <br />outdoor storage. <br /> <br />Commissioner Johnson clarified Condition number one that the accessory structure building would <br />need to be brought up to commercial code, and if at any time the conditions of the IUP aren't met, the <br />permit can be revoked. <br /> <br />Mr. Leeseberg stated that was correct, and if the conditions aren't met, the IUP can be revoked. <br /> <br />Commissioner Rydberg asked if the house located at the property is a residence or office space. <br /> <br />Mr. Leeseberg stated the homeowner/applicant lives in the home. <br /> <br />Chair Beise opened the public hearing. <br /> <br />Jason Bye - 10208 209th Avenue NW – the applicant, outlined the business activities of his wireless <br />construction company. Most of the inventory is owned by cell service providers and the materials are <br />not released to him until the job is to be completed, noting the materials need to be on site within 3 <br />business days of being constructed. The items being stored on site are usually electrical wire, pvc <br />conduit and wire, and deliveries are made by box truck or courier van. His outbuilding was not <br />designed to be used for business, rather to store a small amount of his own personal items and <br />equipment. He stated he is aware it will be required to be a commercial building and has no problem <br />making that investment to bring it into compliance with the commercial building code. He stated he has <br />no problem with the conditions as listed in the memo. He has installed privacy fencing along the west <br />property line to alleviate concerns from neighboring properties. He stated employees don't work at the <br />property and when employees are there, they drop off and leave. Many also take their work trucks <br />home. He asked for the opportunity to be a good property and business owner. <br /> <br />Brian Rucks, 10296 209th Ave. NW – felt the applicant was working with city staff even prior to <br />purchasing the property and thinks staff is trying to put this "under the rug." He expressed concerns <br />with past practices/uses at the Bye property prior to the 2023 CUP application and would that behavior <br />reoccur if an IUP was issued. He expressed concerns about the 2023 CUP conditions. He talked about <br />traffic safety concerns on County Road 33. He felt the fence constructed by Mr. Bye was not placed <br />properly. He stated he doesn't like the way the city is zoning things to allow this type of use. <br /> <br />Mr. Bye explained how he gathered information prior to purchasing the property. He explained a truck <br />accidentally drove into the Wells property, but he didn't have any control over that. He stated he is <br />trying not to create waves. He stated the fence he constructed was properly placed based upon city <br />ordinance. He did have a survey done to ensure he was on his property. <br /> <br />Deann Wells – 10296 209th Ave NW – expressed her concerns with the details outlined in the 2023 <br />CUP Planning Commission packet. <br /> <br />Chair Beise noted the application being reviewed this evening was not for the 2023 CUP request. <br /> <br />Ms. Wells stated she felt it important to note the documentation of the 2023 CUP and the code
The URL can be used to link to this page
Your browser does not support the video tag.