Laserfiche WebLink
8828838848818818828828828 <br />8 <br />3 <br />884VVVVVVVVVVVVSTXXXX31.1%14.2%24.6%881881882882883883 <br />876 876881 881877 877878 878879 879880 880882 <br />882 <br />883 <br />884 <br />881.54 EX880.87 EX881.13 TP881.41 TC880.91 FL881.45 TC880.95 FL881.58 TP882.03 TC881.53 FL881.50 TP880.50 TP881.36 TP881.31 EX881.32 TP881.29 EX881.24 EX881.17 EX883.14 EX881.28 EX883.33 EX883.96 EX884.72 EX882.07 EX881.57 TC881.07 FL881.15 TP0.1%0.9% <br />0.5%0.5%0.8%25.5%4.8%28.3%6.1% <br />SITE BASE <br />GRADING PLAN312:20 PM N:\Projects Current\24-0158.00 Cornerstone ER 11-32-26\Engineering\CAD Files\24-0158.00 Site Base.dwg7/29/2024 <br />PROPOSED RIP RAP880NEW TOP-BACK OF CURB ELEVATIONPROPOSED MAJOR CONTOUR980.50 TCNEW FLOW LINE OF CURB ELEVATIONPROPOSED SLOPE980.50 FLNEW TOP OF PAVEMENT ELEVATION980.50 TPEXISTING ELEVATION980.50 EXNEW FINISHED GRADE ELEVATION980.50 FGLEGEND:GRADING GENERAL NOTES:1.THE CONTRACTOR SHALL NOTE ANY DISCREPANCIES BETWEEN EXISTING CONDITIONSIN THE FIELD REPRESENTED WITHIN THE PLANS AS SHOWN AND ALERT THE ENGINEERBEFORE BIDDING THE PROJECT AND BEGINNING CONSTRUCTION.2.CONTRACTOR SHALL LOCATE AND VERIFY ALL UTILITIES WHICH MAY AFFECT THISWORK AND NOTIFY THE OWNER OF ANY CHANGES. CONTACT LOCAL UTILITYCOMPANIES FOR EXACT LOCATIONS PRIOR TO BIDDING THE PROJECT ANDCOMMENCING WORK.3.CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT SILT AND DEBRISRUN-OFF DURING GRADING OPERATIONS (I.E. SILT FENCE, STRAW BALES, ETC.).4.CONTRACTOR SHALL VERIFY CRITICAL ELEVATIONS TO ENSURE CONFORMANCE WITHGRADING PLAN, PARTICULARLY WITH EXISTING STRUCTURES AND/OR PAVEMENTS TOREMAIN. MEET EXISTING GRADES ALONG STREETS, PROPERTY LINES, AND DRIVEWAYENTRANCES. RESTORE ALL PAVEMENTS THAT REMAIN TO THEIR ORIGINAL IF NOTBETTER CONDITION. NOTIFY OWNER OF ANY CONFLICTS PRIOR TO BIDDING THEPROJECT.5.TURF ESTABLISHMENT AREAS SHALL RECEIVE MINIMUM OF 4" DEPTH AS MEASURED INPLACE OF TOPSOIL. TOPSOIL SHALL BE FURNISHED AND INSTALLED BY THECONTRACTOR. ALL GRADED SLOPES GREATER THAN OR EQUAL TO 5:1 SHALL BEHYDROSEEDED, EROSION CONTROL BLANKETED, OR MULCHED TO HELP STABILIZE THESLOPES BY GENERAL CONTRACTOR.6.PROPOSED SPOT ELEVATIONS ARE TO THE TOP OF CURB UNLESS NOTED OTHERWISE.ELEVATION OF FLOW LINE IS 6" BELOW TOP OF CURB UNLESS OTHERWISE SHOWN.7.CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF CUT,FILL AND WASTE MATERIALS TO BE HANDLED, AND FOR AMOUNT OF GRADING TO BEDONE IN ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON THE DRAWINGS.IMPORT SUITABLE MATERIAL AND EXPORT UNSUITABLE / EXCESS / WASTE MATERIAL ASREQUIRED. ALL COSTS ASSOCIATED WITH IMPORTING AND EXPORTING MATERIALSSHALL BE INCIDENTAL TO THE CONTRACT.8.IT IS INTENDED THAT EARTHWORK (CUT VS. FILL) BALANCE ON SITE. THE CONTRACTORSHALL SUBMIT THE QUANTITY OF MATERIAL AND AMOUNT OF ANTICIPATED GRADEADJUSTMENT FOR REVIEW BY THE ENGINEER A MINIMUM OF FOUR WEEKDAYS PRIORTO MAKING ADJUSTMENTS. ALL GRADE ADJUSTMENTS MUST BE APPROVED BY THEENGINEER. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR WORKASSOCIATED WITH GRADING ADJUSTMENTS, INCLUDING, BUT NOT LIMITED TO,EARTHWORK OPERATIONS, STORM SEWER PIPING AND STRUCTURE ADJUSTMENTS,CONSTRUCTION SURVEYING FOR ADJUSTING FEATURE LOCATIONS ACCORDINGLY, SILTFENCE, ETC.9.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDEAN ACCEPTABLE TURF, THE CONTRACTOR SHALL RE-SEED OR RE-SOD ALL APPLICABLEAREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THEENGINEER.10.ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER, DRAINTILE, OR OTHERPOTENTIAL SOURCE FOR CONTAMINATION SHALL BE INSTALLED AT LEAST 10 FEETHORIZONTALLY FROM ANY WATERMAIN PER MINNESOTA PLUMBING CODE. THISISOLATION DISTANCE SHALL BE MEASURED FROM THE OUTER EDGE OF THE PIPE TOTHE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES ORPIPING OR SIMILAR)11.CONTRACTOR SHALL MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES.PROVIDE TEMPORARY STORM SEWER (INCLUDING, BUT NOT LIMITED TO, CATCH BASINS,MANHOLES, PIPING, ETC.) AS REQUIRED. EXISTING STORM SEWER SHALL NOT BEREMOVED UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED ANDFUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITYCONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED.NSCALE:0'10'20'1"=10'DESCRIPTIONDATENO. <br />REV <br />FILE NO.: <br />DWG FILE: <br />CHECKED BY: <br />DRAWN BY: <br />DESIGN BY: <br />DATE: SHEET NO.LAND SURVEYING <br />CIVIL ENGINEERING <br />ENVIRONMENTAL SERVICES <br />13076 FIRST STREET, BECKER, MN 55308-9322 <br />TEL: 763-262-8822 FAX: 763-262-8844 <br />BOGART, PEDERSON <br />& ASSOCIATES, INC. <br />CORNERSTONE KIA <br />OF ELK RIVER <br />City of Elk River, Sherburne County, MN <br />7/29/2024 <br />24-0158.00 <br />CJD <br />MVW <br />MVW <br />NO <br />T <br /> <br />F <br />O <br />R <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N 879PROPOSED MINOR CONTOUR880EXISTING MAJOR CONTOUR879EXISTING MINOR CONTOURPROPOSED GRADING LIMITSPROPOSED PROJECT BOUNDARYPage 53 of 111