Laserfiche WebLink
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOVERHEAD POWER LINESOVERHEAD POWER LINESQueen St NWSolanum Circle217th Ave NWRiebeck StSHEET X.1SHEET X.2SHEET X.4 <br />SHEET X.1 112453712346789101112Park51315141112139101211129101786416131-RB1-RB1-BHS1-WO1-WO1-HB1-AL1-RMMAINTAIN EXISTING TREES FOR LOTS 4-8MAINTAIN EXISTING TREES FOR LOTS 8-131-HB1-HB1-HB1-HB1-HB1-HBMAINTAIN EXISTING TREES FOR LOTS 11-131-HB1-HB1-HB1-AL1-AL1-AL1-AL1-AL1-AL1-AL1-AL1-AL1-BHS1-BHS1-BHS1-BHS1-BHS1-RM1-RM1-RM1-RM1-RM1-RM1-RM1-WO1-RB1-RB1-RB1-BHS1-RB1-RB1-RB1-RB1-WO1-RB1-HB1-HB1-AL1-BHS1-HB1-HB1-HB1-BHS1-BHS1-RB1-RM1-AL1-RB1-BHS1-BHS1-BHS1-BHS1-WO1-WO1-HB1-HB1-HB1-RM1-RM1-RM1-RM1-AL1-AL1-RB1-BHSCALL 48 HOURS BEFORE DIGGING:TWIN CITY AREA 651-454-0002MINNESOTA TOLL FREE 1-800-252-1166 GOPHER STATE ONE CALL LANDSCAPE <br />SW LANDSCAPING PLANC8.12:56 PM N:\Projects Current\24-0120.00 TCLD Ranch Road\Civil\CAD Files\TCLD Landscape.dwg9/5/2024 <br />NSCALE:0'100'200'1"=100'DESCRIPTIONDATENO. <br />REV <br />FILE NO.: <br />DWG FILE: <br />CHECKED BY: <br />DRAWN BY: <br />DESIGN BY: <br />DATE: SHEET NO.LAND SURVEYING <br />CIVIL ENGINEERING <br />ENVIRONMENTAL SERVICES <br />13076 FIRST STREET, BECKER, MN 55308-9322 <br />TEL: 763-262-8822 FAX: 763-262-8844 <br />BOGART, PEDERSON <br />& ASSOCIATES, INC. <br />MEADOWSWEET BEND <br />DEVELOPMENT <br />City of Elk River, Sherburne County, MN <br />09/05/2024 <br />24-0120.00 <br />MJM, CJD <br />MJM <br />MJM 1 09/05/2024 REVISION PER CITY REVIEW <br />I hereby certify that this plan, specification, or <br />report was prepared by me or under my direct <br />supervision and that I am a duly Licensed <br />Professional Engineer under the laws of the <br />State of Minnesota. <br />Signed: <br />Date: Lic. No. <br />Christopher J. Dahn <br />5862809/05/2024 PROPOSED DECIDUOUS TREEPROPOSED CONIFEROUS TREEPROPOSED CONCRETE SIDEWALKPROPOSED ASPHALT PAVEMENTLEGEND:PROPOSED TREE CLEARINGPage 65 of 84